Details

Identification

Permit Number
200705774
Type
BPSDT - Single Family/Duplex/Triplex
Added On
05-25-2007 04:30 PM
Declared Value
$319,406.00


Status (Closed)

Expires On
05-09-2013
Issued On
05-29-2008
Final On
04-17-2013
Certified On
04-17-2013


Description of Work

SFD PERMIT ONLY * NEW NOC IN OLP FOR SFD ONLY *FLOOD ZONE A5/REQ BASE ELEVATION 36'/RAISED SEAL PRELIMINARY FLOOD ELEVATION CERTIFICATE REQUIRED TO BE IN FILE WITHIN 21 DAYS OF ESTABLISHING FINISHED FLOOR/FINAL ELEVATION CERTIFICATE REQUIRED TO BE IN FILE PRIOR TO CALLING FOR FINAL INSPECTION * SEPERATE PERMIT REQ FOR GAS WORK * SITE APPROVED FOR SFD ONLY ** 16 TREES TO REMAIN***NO GAS PER SITE INSPECTOR NOTES***



Site Information

Primary Parcel (ID 19170700001A0A0002R)
MACKAY PLANTATION UNREC SUBD (LR-02-38 ACCEPTED 1/15/03 SURVEY IN OR BK 1571 PG 867) PCL A-2R: COM AT SW COR OF NE1/4 SEC 7-17-19, TH AL S LN OF NE1/4, N 89 DEG 58M 30S E 1272.49 FT TO PT THAT IS 60 FT W OF NE COR OF SE1/4, TH PAR TO & 60 FT W OF E LN OF W1/2 OF SE1/4, S 0 DEG 0M 20S W 971.45 FT TO POB, TH S 89 DEG 58M 30S W 325 FT, TH S 0 DEG 0M 20S W 147.66 FT, TH N 89 DEG 58M 30S E 279.55 FT TO A PT ON W R/W LN OF N BIG BASS TRL AS DESCR IN OR BK 1483 PG 398, SD PT BEING ON A CURVE CONCAVE E HAVING A CTRL ANG OF 10D 03M 25S RAD OF 240 FT, TH AL ARC OF SD CURVE 42.12 FT (CH=N 09D 16M 53S E 42.07 FT) TO PC OF ANOTHER CURVE CONCAVE W HAVING A CTRL ANG OF 19D 21M 19S RAD OF 180 FT, TH AL ARC OF SD CURVE 60.81 FT (CH= N 4D 37M 56S E 60.52 FT), TO PC OF ANOTHER CURVE CONCAVE W HAVING A CTRL ANG OF 0D 05M 43S RAD OF 2800.14 FT, TH AL ARC OF SD CURVE 4.66 FT (CH= N 04D 59M 52S W 4.66 FT) TO PT OF SD CURVE, TH N 89D 59M 59S W 6.22 FT TO THE POB TITLE IN OR BK 1568 PG 1220
UNREC TRACTS IN 07-17S-19E
17
19
07
1A0A0
0010

Other Linked
10316 N BIG BASS TRL DUNNELLON, FL 34434


Contacts

Contacts

Other APPLICANT

Property Owner DOUGLAS A & TENIA R WONCH 10316 N BIG BASS TRAIL DUNNELLON, FL 34434

Other KRYSTAL CADY 2509 W CASTANIA DR CITRUS SPRINGS, FL 34434

Licensed Contact DO NOT USE THIS CONTACT

Licensed Contact DO NOT USE THIS CONTACT

Licensed Contact DO NOT USE THIS CONTACT

Licensed Contact Primary DO NOT USE THIS CONTACT ADD A NEW CONTACT



Related

Building Permits

Child 201805391 Plumbing/Irrigation/Solar Type 05-16-2018 Closed

Child 201705774 Single Family/Duplex/Triplex 06-01-2017 Closed

Child 201511198 Hvac Or Mechanical Type Permit 11-11-2015 Closed

Parent 200705774 Single Family/Duplex/Triplex 05-25-2007 Closed



Progress

Reviews
06-12-2007RESIDENTIAL BUILDING REVIEW Waived

Additional Information

06-13-2007B-REV-PROVIDE ADD ENG DET 11-27-2007
1. ADD (1) FILL @ EACH FRONT CORNER OF LIVING ROOM AND DINING ROOM WHERE MASONRY WALL STEPS DOWN FROM 12'-0" TO 9'-4". 2. ADD DETAIL OF STEP DOWN REINFORCING FOR MASONRY. 3. THIS HOUSE IS IN FLOOD ZONE REQUIRED MINIMUM ELEVATION OF HOUSE FLOOR TO BE ABOVE B.F.E. OF 36. IF GARAGE IS NOT ABOVE B.F.E. THEN IT MUST HAVE FLOOD VENTS. PLEASE SHOW ON PLANS FLOOR ELEVATIONS FOR HOUSE AND GARAGE. 4. SHOW DETAILS OF STRONGBACK CONNECTIONS HOW IS IT TO BE ATTACHED TO TRUSSES STRAPS, NAILS? PLEASE SHOW ON DETAIL A-3 "X". 5. RELOCATE TRUSS STRAP AS SHOWN IN A-3 "X" TO CORRECT LOCATION. 6. ADD NOTE TO PLANS SPECIFYING 1/2" DRYWALL ON WALL AND CEILING OF GARAGE TO PROVIDE SEPARATION ALSO ON ATTIC ACCESS DOOR. 7. PLEASE LIST STEEL PLACEMENT FOR THE LINTEL IN BEDROOM #2 & #3 THEY HAVE A POINT LOAD OF 4324# FROM TRUSS T-1. 8. PLEASE PROVIDE ELECTRICAL RISER DIAGRAM.

06-12-2007RESIDENTIAL ADDRESSING REVIEW Approved

06-12-2007FINAL PROCESSING REVIEW Approved

06-12-2007FLOOD REVIEW Approved

RESIDENTIAL BUILDING REVIEW Waived

Additional Information

11-27-2007B-REV-PROVIDE ADD ENG DET 12-03-2007
1. HOUSE GARAGE SLAB BELOW ELEVATION 36. WHICH IS BASE FLOOD ELEVATION RAISE FLOOR OR INSTALL FLOOD VENTS AT RATE OF 1" PER SQUARE FOOT OF GARAGE. 2. PROVIDE REVISED TRUSS DRAWINGS TO MATCH REVISED PLAN BY TRUSS MANUFACTURER. 3. PROVIDE REVISED HVAC PLAN FOR NEW DESIGN. 4. PROVIDE REVISED ENERGY FORM TO MATCH NEW BUILDING. 5. PROVIDE REVISED SITE PLAN FOR NEW DESIGN.

RESIDENTIAL SITE PLAN REVIEW Approved
SITE APPROVED FOR SFD ONLY ** 16 TREES TO REMAIN
RESIDENTIAL BUILDING REVIEW Waived

Additional Information

12-03-2007B-REV-PROVIDE ADD ENG DET 12-19-2007
1. PROVIDE REVISED HVAC PLAN TO MATCH NEW REVISED FLOOR PLAN. 2. PROVIDE REVISED ENERGY CALCULATIONS TO MATCH NEW REVISED FLOOR PLAN.

RESIDENTIAL SITE PLAN REVIEW Waived
RESUBMITTAL BROUGHT IN - NEW CONSTRUCTION PLAN INCREASES IN SQ.FOOTAGE & CHANGE IN SETBACKS
06-12-2007RESIDENTIAL BUILDING REVIEW Approved

RESIDENTIAL BUILDING REVIEW Approved
2/4/10 Revision - Receive sealed plans from David King showing pads and door locations. Requested by inspector, G T Licht sh
RESIDENTIAL BUILDING REVIEW Approved


Conditions

IS FLOOD ELEV SURVEY IN FILE?? APPROVED on 06-12-2007
FLOOD ZONE A5/REQ BASE ELEV 36'/RAISED SEAL PREL FLOOD ELEV CERT REQ TO BE IN FILE WITHIN 21 DAYS OF ESTABLISHING FLINISHED FLOOR/FINAL ELE CERT REQ TO BE IN FILE PRIOR TO CALLING FOR FINAL INSP

TREE PRESERVATION APPROVED on 06-12-2007
16 TREES TO REMAIN ON SITE

PROOF OF OWNERSHIP NEEDED APPROVED on 06-12-2007

NOTICE OF COMMENCEMENT NEEDED APPROVED on 06-12-2007
IN FILE FOR SFD ONLY

FINAL ELEVTN CERT COORD REVIEW APPROVED on 06-04-2012

FINAL ELEV CERT-FLOOD SPEC REV APPROVED on 06-04-2012

PREL ELEV CERT-FLOOD SPEC REV APPROVED on 05-27-2010

PRELMNRY ELEV CERT COORD RVIEW APPROVED on 05-27-2010

ADDRESS MUST BE POSTED/VISIBLE APPLICATION UPDATE DOCUMENTED on 04-17-2013

NOTICE OF COMMENCEMENT NEEDED APPROVAL RECEIVED on 11-18-2008
NEW NOC IN OLP FOR SFD ONLY*


Inspections
BOND BEAM/STEMWALL (#1)Scheduled For: 10-21-2010 Passed on 10-21-2010

1ST ROUGH PLUMB (#1)Scheduled For: 04-14-2010 Passed on 04-14-2010

SLAB (#1)Scheduled For: 04-20-2010Is Assigned Passed on 04-20-2010

LINTEL (#1)Scheduled For: 05-24-2011 Closed on 05-24-2011
***IS THIS REQUIRED??***KIME
Violations

05-24-2011OTHER
Frame construction, no lintel inspection needed.

SHEATHING (#1)Scheduled For: 11-29-2010 Passed on 11-29-2010

Violations

11-29-2010OTHER-GENERAL ALL TYPES
Walls and roof.

ROUGH ELECTRICAL (#1)Scheduled For: 04-11-2011 Passed on 04-11-2011

ROUGH MECHANICAL (#1)Scheduled For: 04-11-2011 Passed on 04-11-2011

2ND ROUGH PLUMBING (#1)Scheduled For: 03-04-2011 Passed on 03-04-2011

GAS ROUGH (#1)Scheduled For: 05-24-2011 Closed on 05-24-2011
***IS THIS REQAUIRED??***KIME
Violations

05-24-2011OTHER
No gas.

STRUCTURAL FRAME (#1)Scheduled For: 04-11-2011 Passed on 04-11-2011

FRAME (#1)Scheduled For: 04-11-2011 Passed on 04-11-2011

Violations

04-11-2011CORRECT & PROCEED
8' special order doors to garage will be put in after drywall.

ROOFING (#1)Scheduled For: 11-09-2012Is Assigned Passed on 11-09-2012

INSULATION (#1)Scheduled For: 05-24-2011 Passed on 05-24-2011

DRYWALL AND FIREWALL (#1)Scheduled For: 11-28-2011 Passed on 11-28-2011

WATER TIE IN [SUINSPKEY=1078] (#1)Scheduled For: 04-17-2013Is Assigned Passed on 04-17-2013
PM INSPECTION APPRECIATED
FINAL BUILD (#1)Scheduled For: 04-17-2013Is Assigned Passed on 04-17-2013
PM INSPECTION APPRECIATED
FINAL INSULATION (#1)Scheduled For: 04-17-2013Is Assigned Passed on 04-17-2013
PM INSPECTION APPRECIATED
FINAL PLUMBING (#1)Scheduled For: 04-17-2013Is Assigned Passed on 04-17-2013
PM INSPECTION APPRECIATED
FINAL ELECTRIC (#1)Scheduled For: 04-17-2013Is Assigned Passed on 04-17-2013
PM INSPECTION APPRECIATED
FINAL MECH (#1)Scheduled For: 04-17-2013Is Assigned Passed on 04-17-2013
PM INSPECTION APPRECIATED
PRE ELECTRIC PRE FINAL (#1)Scheduled For: 05-24-2012 Passed on 05-24-2012

PRE ELECTRIC PRE FINAL (#2)Scheduled For: 06-13-2012 Passed on 06-13-2012
****REQUESTING ANOTHER INSPECTION PER PROGRESS ENERGY REQUEST****KIME
FOOTER (#1)Scheduled For: 01-20-2010 Passed on 01-20-2010

Violations

01-20-2010CORRECT & PROCEED
Owner is working with architech on revision at garage for wall without offset and pads changed. He will submit revision to Building Department. Everything OK to pour footer.

DRY-IN INSPECTION (#1)Scheduled For: 12-07-2010 Passed on 12-07-2010

Violations

12-07-2010CORRECT & PROCEED
Penitrations in roof need to be checked at final roof inspection. Owner wants to get dryed in, but unable to get trades completed at this time. GTL.

90 DAY EXTENSION (#1) Passed on 03-12-2008

90 DAY EXTENSION (#2) Passed on 09-01-2009

90 DAY EXTENSION (#3) Closed on 04-22-2023

90 DAY EXTENSION (#4) Passed on 05-23-2012

RESIDENTIAL C.O. ISSUED (#1)Scheduled For: 04-17-2013 Passed on 04-17-2013

T-POLE [SUINSPKEY=3206] (#1)Scheduled For: 11-26-2008 Failed on 11-26-2008

Violations

11-26-2008TEMP POWER POLE MISC
250.52

T-POLE [SUINSPKEY=3206] (#2)Scheduled For: 12-01-2008 Passed on 12-01-2008

T-POLE [SUINSPKEY=3206] (#3)Scheduled For: 04-27-2010Is Assigned Passed on 04-27-2010

SEWER TIE IN [SUINSPKEY=3209] (#1)Scheduled For: 04-17-2013Is Assigned Passed on 04-17-2013
PM INSPECTION APPRECIATED