T-POLE [SUINSPKEY=1060] (#1)Scheduled For: 05-29-2002
Passed on 05-29-2002
1ST ROUGH PLUMB (#1)Scheduled For: 05-15-2002
Passed on 05-15-2002
SLAB (#1)Scheduled For: 05-20-2002
Passed on 05-20-2002
LINTEL (#1)Scheduled For: 07-01-2002
Passed on 07-01-2002
SHEATHING (#1)Scheduled For: 07-25-2002
Passed on 07-25-2002
ROUGH ELECTRICAL (#1)Scheduled For: 08-09-2002
Passed on 08-09-2002
ROUGH MECHANICAL (#1)Scheduled For: 08-09-2002
Passed on 08-09-2002
2ND ROUGH PLUMBING (#1)Scheduled For: 08-09-2002
Failed on 08-09-2002
2ND ROUGH PLUMBING
50# MIN TEST REQ ON WTR PIPE-no pressure on gage
2ND ROUGH PLUMBING (#2)Scheduled For: 08-13-2002
Passed on 08-13-2002
FRAME (#1)Scheduled For: 08-09-2002
Passed on 08-09-2002
INSULATION (#1)Scheduled For: 09-04-2002
Failed on 09-04-2002
09-04-2002INSULATION
WINDOWS/ DOORS NOT POLYSEAL-polyseal all windows and doors
INSULATION (#2)Scheduled For: 09-06-2002
Passed on 09-06-2002
09-04-2002INSULATION
Complied09-06-2002
WINDOWS/ DOORS NOT POLYSEAL-polyseal all windows and doors
WATER TIE IN [SUINSPKEY=1078] (#1)Scheduled For: 08-22-2002
Passed on 08-22-2002
SEWER TIE IN [SUINSPKEY=1079] (#1)Scheduled For: 02-07-2003
Passed on 02-07-2003
FINAL BUILD (#1)Scheduled For: 02-07-2003
Passed on 02-07-2003
FINAL INSULATION (#1)Scheduled For: 02-07-2003
Passed on 02-07-2003
FINAL PLUMBING (#1)Scheduled For: 02-07-2003
Passed on 02-07-2003
FINAL ELECTRIC (#1)Scheduled For: 02-07-2003
Passed on 02-07-2003
FINAL MECH (#1)Scheduled For: 02-07-2003
Passed on 02-07-2003
D/W APRON-FINAL INSPECTION (#1)
Passed on 03-25-2003
FINAL ELEVATION CERTIFICATE (#1)Scheduled For: 02-06-2003
Passed on 02-06-2003
RESIDENTIAL C.O. ISSUED (#1)
Passed on 02-11-2003