USE BLD202510535-03
Please complete the solar attachment affidavit and re-submit once installation is completed.
Licensed Contact Primary AFFORDABLE SOLAR ROOF & AIR 4914 CREEKSIDE DRIVE, SUITE A CLEARWATER, FL 33760
Property Owner RINELLA GREGORY GEORGE AND ROXANNE LYNN 6656 W HILGER CT HOMOSASSA, FL 34448
Child BLD202510535-03 Amendment Added On: 11-19-2025 Status: Closed
Child BLD202510535-02 Amendment Added On: 10-28-2025 Status: Closed
Child BLD202510535-01 Amendment Added On: 08-27-2025 Status: Closed
10-03-2025See Violation Details in Comments Transferred to Re-inspection10-03-2025 Not per plans r107.4 not per county approved construction documents 100 percent reinspection when county approves plan revisions. below is a list to help at next inspection, not a full list of needed corrections. 1. need to revise plan to reflect all panels, and disconnects installed. and correct locations. 2. plan shows 30 amp breaker , line taps have been used instead. 3. earth grounding is not per plans. 4. generator components have been added that are not on the plan.
10-03-2025See Violation Details in Comments Transferred to Re-inspection11-10-2025 Not per plans r107.4 not per county approved construction documents 100 percent reinspection when county approves plan revisions. below is a list to help at next inspection, not a full list of needed corrections. 1. need to revise plan to reflect all panels, and disconnects installed. and correct locations. 2. plan shows 30 amp breaker , line taps have been used instead. 3. earth grounding is not per plans. 4. generator components have been added that are not on the plan.
11-10-20252nd Fail Same Reason Transferred to Re-inspection11-10-2025 Not to Plan. Install must match plan Plans show 30amp back fed breaker and non-fused disconnect. Line side tap and unfused disconnect installed. If line side tap is installed the disconnect must be fused. R.V. panel installed and not on plans.
10-03-2025See Violation Details in Comments Complied12-05-2025 Not per plans r107.4 not per county approved construction documents 100 percent reinspection when county approves plan revisions. below is a list to help at next inspection, not a full list of needed corrections. 1. need to revise plan to reflect all panels, and disconnects installed. and correct locations. 2. plan shows 30 amp breaker , line taps have been used instead. 3. earth grounding is not per plans. 4. generator components have been added that are not on the plan.
11-10-20252nd Fail Same Reason Complied12-05-2025 Not to Plan. Install must match plan Plans show 30amp back fed breaker and non-fused disconnect. Line side tap and unfused disconnect installed. If line side tap is installed the disconnect must be fused. R.V. panel installed and not on plans.