04-29-2025PERMIT REVIEW COMMENT
<b><u>FLOOD DENIED:</u></b><div><div>FLOOD ZONE: AE - BFE: 12.0', DFE: 13.0' (PANEL: 12017C0186E, EFFECTIVE: 01/15/2021 - 120063) - STRUCTURE LOCATED IN ZONE: AE - NEW ELECTRICAL - ELECTRIC MUST MEET BFE: 10.0', EXISTING GRADE APPROX: 4.0' - PRE-FIRM STRUCTURE - ELEVATION VERIFICATION AT FINAL INSPCT - NOT A SUBSTANTIAL IMPROVEMENT, (BUILDING VALUE: $407,752.80, PROJECT VALUE: $2,006.00, IMPROVEMENT: 0.49%) - MISSING ALL FLOOD HAZARD INFORMATION - MISSING ELECTRIC STATEMENT AND ELEVATIONS<b> - WHAT IS THE ELEVATION OF THE BOTTOM OF THE SERVICE PANEL?</b></div><div><ol><li>FLOOD ZONE WHERE THE PROPOSED STRUCTURE WILL BE LOCATED MUST BE SPECIFIED (CCCO SEC 18-193 - FBC R322.2, R322.3 - DETERMINES REQUIREMENTS)</li><li>BFE & DFE ELEVATIONS MUST BE STATED AND SHOWN ON ELEVATION PAGES (CCCO SEC 18-193 - FBC R322.1, R322.1.4.1)</li><li>STATEMENT IS REQUIRED THAT ALL MECHANICAL, ELECTRICAL, AND PLUMBING EQUIPMENT IS TO BE AT OR ABOVE DFE (CCCO SEC 18-193 - FBC R322.1.6, FEMA P-348, PAGES 3-8) </li><li>ALL MATERIAL BELOW DFE MUST BE FLOOD RESISTANT AND CONFORM TO THE PROVISIONS OF FEMA TB-2(CCCO SEC 18-193 - FBC R322.1.8)</li></ol><div><b><u>ELECTRIC DENIED:</u></b></div></div></div><div>FLOOD ZONE: AE - BFE: 12.0', DFE: 13.0' (PANEL: 12017C0186E, EFFECTIVE: 01/15/2021 - 120063) - STRUCTURE LOCATED IN ZONE: AE - NEW ELECTRICAL - ELECTRIC MUST MEET BFE: 10.0', EXISTING GRADE APPROX: 4.0' - PRE-FIRM STRUCTURE - ELEVATION VERIFICATION AT FINAL INSPCT - NOT A SUBSTANTIAL IMPROVEMENT, (BUILDING VALUE: $407,752.80, PROJECT VALUE: $2,006.00, IMPROVEMENT: 0.49%) - MISSING ALL FLOOD HAZARD INFORMATION - MISSING ELECTRIC STATEMENT AND ELEVATIONS - WHAT IS THE ELEVATION OF THE BOTTOM OF THE SERVICE PANEL?</div><div>1. FLOOD ZONE WHERE THE PROPOSED STRUCTURE WILL BE LOCATED MUST BE SPECIFIED (CCCO SEC 18-193 - FBC R322.2, R322.3 - DETERMINES REQUIREMENTS)</div><div>2. BFE & DFE ELEVATIONS MUST BE STATED AND SHOWN ON ELEVATION PAGES (CCCO SEC 18-193 - FBC R322.1, R322.1.4.1)</div><div>3. STATEMENT IS REQUIRED THAT ALL MECHANICAL, ELECTRICAL, AND PLUMBING EQUIPMENT IS TO BE AT OR ABOVE DFE (CCCO SEC 18-193 - FBC R322.1.6, FEMA P-348, PAGES 3-8) </div><div>4. ALL MATERIAL BELOW DFE MUST BE FLOOD RESISTANT AND CONFORM TO THE PROVISIONS OF FEMA TB-2(CCCO SEC 18-193 - FBC R322.1.8)</div>