PERMIT SEARCH PORTAL
Details

Identification

Permit Number
BLD202501503
Type
Commercial - Commercial
Added On
01-30-2025 04:21 PM
Declared Value
$8,539,206.00


Status (Co Issued)

Expires On
08-01-2026
Issued On
08-07-2025
Final On
02-02-2026
Certified On
02-02-2026


Description of Work

****COMMERCIAL***Freestanding Emergency RoomBuilding is fully sprinklered, Type IIB construction and is classified as Institutional Group I-2, with special requirements based on use as an Ambulatory Care Facility. It is an extension of the main Emergency Department of HCA Florida Citrus Hospital.***** *SEPARATE PERMITS REQUIRED FOR BUILDING, SITE LIGHTING, DUMPSTER, SIGNAGE****SEE SITE DEVELOPMENT PERMIT BLD2024340069*****NOC REQ & IN OR BK3571 PG635



Site Information

Primary Address
3470 W NORVELL BRYANT HWY LECANTO, FL 34461
Other Linked
1818280000144400000 UNREC TRACTS IN 28-18S-18E
18
18
28
14440
0000


Contacts

Contacts

Other GA Studio 2625 5th Ave N. Bldg C. Bessemer, AL 35020

Licensed Contact Primary BLOX LLC 2625 5TH AVE NORTH, JEFFERSON OUT OF STATE BESSEMER, AL 35020

Licensed Contact OWEN ELECTRIC COMPANY INC 1775 LAKESIDE AVENUE, ST JOHNS COUNTY ST AUGUSTINE, FL 32084

Licensed Contact GOLDEN & ASSOCIATES CONSTRUCTION LLC CMC 2212 1ST AVE S, OUT OF STATE BIRMINGHAM, AL 35233

Licensed Contact GOLDEN & ASSOCIATES CONSTRUCTION LLC CFC 2212 1ST AVE S, OUT OF STATE BIRMINGHAM, AL 35233

Licensed Contact TURNER CONSTRUCTION COMPANY 135 W CENTRAL BLVD, ORANGE ORLANDO, FL 32801



Related

Building Permits

Child BLD202511842 Electrical 08-29-2025 Closed

Parent BLD2024340069 Non-building Miscellaneous 12-02-2024 Finalized

Child BLD2024340069 Non-building Miscellaneous 12-02-2024 Finalized



Progress

Reviews
Permit Specialist Review Approved
| Assigned to Reviewer: TINA L WILKERSON tina.wilkerson@citrusbocc.com |
Addressing Review Approved

Fire Review Request for Information
Prints must reflect current Fire Prevention Code. Current Code Florida Fire Prevention Code 8th edition
Additional Information

02-24-2025Fire Misc.
Prints must reflect current Fire Prevention Code. Current is Florida Fire Prevention Code 8th edition.

Site Review Request for Information

Additional Information

03-04-2025SITE MISC
PENDING APPROVAL OF SITE DEVELOPMENT PERMIT&nbsp;<span style="background-color: rgb(229, 229, 229);">BLD2024340069</span>

Utility Review Request for Information

Additional Information

02-12-2025Application for Service Request
<p class="MsoNormal">1. An application for water/sewer service must be received before this permit can be approved.&nbsp; To obtain an application for service you may call our office at 352-527-7650 or visit <a href="http://www.citrusbocc.com/">www.citrusbocc.com</a>&nbsp; &nbsp; &nbsp; &nbsp;&nbsp;<o:p></o:p></p>

02-12-2025Utilities Misc.
ALL WET TAPS, PRESSURE TESTS, BACTERIAL TESTING AND LIFT STATION START UPS MUST BE WITNESSED BY CCUD AND MUST BE SCHEDULED 48 HOURS IN ADVANCE BY APPOINTMENT (MONDAY - THURSDAY).&nbsp;<div>PLEASE CALL (352) 527-7650 AND PRESS 4 TO SCHEDULE.&nbsp;&nbsp;<div><br><div>ALL BACKFLOW PREVENTION DEVICES SHALL BE TESTED AND APPROVED BY A CERTIFIED PLUMBING CONTRACTOR CERTIFIED BYTHE STATE OF FLORIDA AND/OR APPROVED BY THE CITRUS COUNTY.&nbsp; PERMITTEE/OWNER MUST SUPPLY, INSTALL, TEST AND CERTIFY ANY AND ALL RPZ/BACK FLOW TYPE DEVICES.&nbsp; A COPY OF THE CERTIFICATION(S) MUST BERECEIVED IN THIS OFFICE ONCE COMPLETED AND BEFORE FINAL INSPECTION IS PASSED.&nbsp; OWNER OR LICENSED PLUMBER MUST PROVIDE UTILITIES A COPY OF ANNUAL TEST AND INSPECTION RESULTS</div><div><br></div><div>PERMITTEE/OWNER MUST OBTAIN A CITRUS COUNTY RIGHT OF WAY UTILIZATION PERMIT PRIOR TO CCU (CITRUS COUNTY UTILITIES)WITNESSING ANY WET TAPS TO THE WATER OR FORCE MAIN SEWER LINE.</div><div>COPY OF PERMIT MUST BE RECEIVED BY CCU.&nbsp;</div><div><br></div><div><br></div></div></div>

02-12-2025Utilities Misc.
<span style="font-size:12.0pt;line-height:115%; font-family:&quot;Calibri&quot;,sans-serif;mso-ascii-theme-font:minor-latin;mso-fareast-font-family: Calibri;mso-fareast-theme-font:minor-latin;mso-hansi-theme-font:minor-latin; mso-bidi-theme-font:minor-latin;mso-ansi-language:EN-US;mso-fareast-language: EN-US;mso-bidi-language:AR-SA">FOLLOWING FINAL INSPECTIONS AND COMPLETION OF WORK, PROJECT ENGINEER SHALL SUBMIT A CERTIFICATION OF PROJECT COMPLETION TO INCLUDE A STATEMENT OF CERTIFICATION THAT ALL CONSTRUCTION IS COMPLETE IN ACCORDANCE WITH MINIMIUM STANDARDS AND THE PLANS AND SPECIFICATIONS.&nbsp; PROVIDE AS-BUILT RECORD DRAWINGS TO CCU, INCLUDING TWO SETS OF 24” X 36” BLUELINE DRAWINGS AND ONE SET OF HALF-SIZE PLANS, SIGNED AND SEALED BY PROJECT ENGINEER.&nbsp; FURNISH ONE DIGITAL COPY IN AUTO CAD IN R14 (OR HIGHER) FORMAT</span>

03-06-2025Utilities Misc.
BUILDING PERMIT WILL BE APPROVED ONCE THE SITE PERMIT BLD2024340069 IS APPROVED.&nbsp;

Building Plan Review Approved

Mechanical Plan Review Approved
| Assigned to Reviewer: Mike Hills |
Plumbing Plan Review Approved

Electrical Plan Review Approved
| Assigned to Reviewer: Jeremy Lentz jeremy.lentz@citrusbocc.com |
Review Consolidation Request for Information
| Assigned to Reviewer: JULIA VASCIMINI julia.vascimini@citrusbocc.com |
Review Distribution Approved
| Assigned to Reviewer: JULIA VASCIMINI julia.vascimini@citrusbocc.com |
Fire Review Approved
<div style="border: 0; margin: 0; padding: 0; vertical-align: baseline; color: inherit"><div tabindex="0" class="XbIp4 jmmB7 GNqVo allowTextSelection OuGoX" style="border: 0; font-style: inherit; font-variant: inherit; font-stretch: inherit; font-size: 15px; line-height: inherit; font-family: inherit; font-size-adjust: inherit; font-kerning: inherit; font-feature-settings: inherit; margin: 12px 16px 0 52px; padding: 0 0 2px; vertical-align: baseline; color: var(--neutralDark); cursor: auto; user-select: text; overflow-y: auto; outline: 0 none"><div style="border: 0; margin: 0; padding: 0; vertical-align: baseline; color: inherit"><div style="border: 0; margin: 0; padding: 0; vertical-align: baseline; color: inherit"><div dir="ltr" style="border: 0; margin: 0; padding: 0; vertical-align: baseline; color: inherit"><div style="border: 0; margin: 0; padding: 0; vertical-align: baseline; color: inherit"><div style="border: 0; font-size-adjust: inherit; font-kerning: inherit; font-feature-settings: inherit; margin: 0; padding: 0; vertical-align: baseline; color: rgba(0, 0, 0, 1)">Email below confirms 13'6" clearance. Fire extinguishers, Knox box, and light weight truss sign will be verified in Final Fire.</div><div style="border: 0; font-size-adjust: inherit; font-kerning: inherit; font-feature-settings: inherit; margin: 0; padding: 0; vertical-align: baseline; color: rgba(0, 0, 0, 1)"><br></div><div style="border: 0; font-size-adjust: inherit; font-kerning: inherit; font-feature-settings: inherit; margin: 0; padding: 0; vertical-align: baseline; color: rgba(0, 0, 0, 1)"><br></div><div style="border: 0; font-size-adjust: inherit; font-kerning: inherit; font-feature-settings: inherit; margin: 0; padding: 0; vertical-align: baseline; color: rgba(0, 0, 0, 1)">Jeremy,</div><div style="border: 0; font-size-adjust: inherit; font-kerning: inherit; font-feature-settings: inherit; margin: 0; padding: 0; vertical-align: baseline; color: rgba(0, 0, 0, 1)">Thanks for reaching out with your concern, I was looped into your email.</div><div style="border: 0; font-size-adjust: inherit; font-kerning: inherit; font-feature-settings: inherit; margin: 0; padding: 0; vertical-align: baseline; color: rgba(0, 0, 0, 1)">The 13'-1" height on the A201 sheet is referring to the lower Parapet height. The ambulance canopy clearance, is 5" higher than the parapet, getting to 13'-6".</div><div style="border: 0; font-size-adjust: inherit; font-kerning: inherit; font-feature-settings: inherit; margin: 0; padding: 0; vertical-align: baseline; color: rgba(0, 0, 0, 1)"><img size="68913" tabindex="0" class="Do8Zj" style="border: 0; margin: 0; padding: 0; vertical-align: baseline; color: inherit; animation: 0.1s ease-out 0s 1 normal none running do8zj; width: 484px; height: 295px; max-width: 1009px; cursor: pointer"></div><div style="border: 0; font-size-adjust: inherit; font-kerning: inherit; font-feature-settings: inherit; margin: 0; padding: 0; vertical-align: baseline; color: rgba(0, 0, 0, 1)">That is relative to the building FFE. The sidewalk will slope away from the building at the Ambulance entrance down to the driving surface at its crown, which slopes towards the entry/exit directions of the driving path. The result will be 13'-7" or greater clearance at all points below the Ambulance Canopy.</div><div style="border: 0; font-size-adjust: inherit; font-kerning: inherit; font-feature-settings: inherit; margin: 0; padding: 0; vertical-align: baseline; color: rgba(0, 0, 0, 1)"><br></div><div style="border: 0; font-size-adjust: inherit; font-kerning: inherit; font-feature-settings: inherit; margin: 0; padding: 0; vertical-align: baseline; color: rgba(0, 0, 0, 1)">The entry canopy is slightly above 13'-1" at the lowest point which is not above the driving path of any vehicle. The clearance above the bollards is ~13'-8" and continues to slope upward from there as it extends over the vehicle's driving path.</div><div style="border: 0; font-size-adjust: inherit; font-kerning: inherit; font-feature-settings: inherit; margin: 0; padding: 0; vertical-align: baseline; color: rgba(0, 0, 0, 1)"><img size="99493" tabindex="0" class="Do8Zj" style="border: 0; margin: 0; padding: 0; vertical-align: baseline; color: inherit; animation: 0.1s ease-out 0s 1 normal none running do8zj; width: 408px; height: 242px; max-width: 1009px; cursor: pointer"></div><div style="border: 0; font-size-adjust: inherit; font-kerning: inherit; font-feature-settings: inherit; margin: 0; padding: 0; vertical-align: baseline; color: rgba(0, 0, 0, 1)">Hope this clarifies the height compliance.</div><div style="border: 0; font-size-adjust: inherit; font-kerning: inherit; font-feature-settings: inherit; margin: 0; padding: 0; vertical-align: baseline; color: rgba(0, 0, 0, 1)">Thanks,</div><div style="border: 0; font-size-adjust: inherit; font-kerning: inherit; font-feature-settings: inherit; margin: 0; padding: 0; vertical-align: baseline; color: rgba(0, 0, 0, 1)"><br></div><div style="border: 0; margin: 0; padding: 0; vertical-align: baseline; color: inherit"><p><span style="border: 0; margin: 0; padding: 0; vertical-align: baseline; color: rgba(34, 42, 53, 1)"><b>Kelly Lewis</b></span></p><p><span style="border: 0; margin: 0; padding: 0; vertical-align: baseline; color: rgba(34, 42, 53, 1)">Architect</span></p><p><span style="border: 0; margin: 0; padding: 0; vertical-align: baseline; color: rgba(196, 89, 17, 1)"><b><a rel="noopener noreferrer" target="_blank" href="http://www.gastudio.com/" title="http://www.gastudio.com/" style="border: 0; margin: 0; padding: 0; vertical-align: baseline; color: rgba(196, 89, 17, 1)">GA&nbsp;</a></b><a rel="noopener noreferrer" target="_blank" href="http://www.gastudio.com/" title="http://www.gastudio.com/" style="border: 0; margin: 0; padding: 0; vertical-align: baseline; color: rgba(196, 89, 17, 1)">Studio</a>&nbsp;|&nbsp;<b><a rel="noopener noreferrer" target="_blank" href="http://www.bloxbuilt.com/" title="http://www.bloxbuilt.com/" style="border: 0; margin: 0; padding: 0; vertical-align: baseline; color: rgba(196, 89, 17, 1)">BLOX</a></b></span></p><p><span style="border: 0; margin: 0; padding: 0; vertical-align: baseline; color: rgba(128, 128, 128, 1)">2625 5th Ave North, Building C</span></p><p><span style="border: 0; margin: 0; padding: 0; vertical-align: baseline; color: rgba(128, 128, 128, 1)">Bessemer, AL 35020</span></p><p>205.643.7875</p></div></div></div></div></div></div><div class="g4Y3U" style="border: 0; margin: 0; padding: 0; vertical-align: baseline; color: inherit; clear: both"></div></div><div class="wnVEW" style="border: 0; font-style: inherit; font-variant: inherit; font-stretch: inherit; font-size: 15px; line-height: inherit; font-family: inherit; font-size-adjust: inherit; font-kerning: inherit; font-feature-settings: inherit; margin: 0 0 0 31px; padding: 0; vertical-align: baseline; color: inherit"><div class="DVtfe" style="border-top: 0; border-right: 0; border-bottom: 1px solid var(--neutralLight); border-left: 0; font-variant-numeric: inherit; font-variant-east-asian: inherit; font-variant-alternates: inherit; font-variant-position: inherit; font-stretch: inherit; line-height: inherit"></div><div style="border: 0; font-variant-numeric: inherit; font-variant-east-asian: inherit; font-variant-alternates: inherit; font-variant-position: inherit; font-stretch: inherit; line-height: inherit"><div tabindex="0" class="Yy5or GNqVo allowTextSelection OuGoX" style="border-top: 0; border-right: 0; border-bottom: 0; border-left: 1px solid var(--themeDarkAlt); margin: 0; padding: 0 16px; vertical-align: baseline; color: inherit; cursor: auto; user-select: text; overflow-y: auto"><div style="border: 0; margin: 0; padding: 0; vertical-align: baseline; color: inherit"><div style="border: 0; margin: 0; padding: 0; vertical-align: baseline; color: inherit"><div dir="ltr" style="border: 0; margin: 0; padding: 0; vertical-align: baseline; color: inherit"><div style="border: 0; margin: 0; padding: 0; vertical-align: baseline; color: inherit"><div style="border: 0; margin: 0; padding: 0; vertical-align: baseline; color: inherit"></div></div></div></div></div></div></div></div>
Site Review Request for Information
| Assigned to Reviewer: Kellianne Caudill Kellianne.Caudill@citrusbocc.com |
Additional Information

03-24-2025SITE MISC
PENDING APPROVAL OF SITE DEVELOPMENT PLAN FURTHER CONDITIONS MAY APPLY&nbsp;

Utility Review Approved
<div><span style="font-size: 12pt; line-height: 18.4px; font-family: Calibri, sans-serif;">PROJECT MUST CONNECT TO CITRUS COUNTY'S CENTRAL WATER AND/OR SEWER SYSTEMS AS SHOWN ON THE FINAL APPROVED SITE PLANS.&nbsp;</span></div><div><br></div><div><p class="MsoNormal"><span style="color: rgb(26, 26, 26); background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial;"><b>ALL WET TAPS, PRESSURE TESTS, BACTERIAL TESTING AND LIFT STATION START UPS MUST BE WITNESSED BY CCUD AND MUST BE SCHEDULED 48 HOURS IN ADVANCE BY APPOINTMENT (MONDAY - THURSDAY). PLEASE CALL (352) 527-7650 AND PRESS 4 TO SCHEDULE.&nbsp;&nbsp;</b><o:p></o:p></span></p><p class="MsoNormal"><span style="color: rgb(26, 26, 26); background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial;"><br></span></p><p class="MsoNormal"><span style="color: rgb(26, 26, 26); background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial;"></span></p><p class="MsoNormal"><span style="color: rgb(26, 26, 26); background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial;">ALL BACKFLOW PREVENTION DEVICES SHALL BE TESTED AND APPROVED BY A CERTIFIED PLUMBING CONTRACTOR CERTIFIED BY THE STATE OF FLORIDA AND/OR APPROVED BY THE CITRUS COUNTY.&nbsp;&nbsp;PERMITTEE/OWNER MUST SUPPLY, INSTALL, TEST AND CERTIFY&nbsp;<b>ANY AND ALL</b>&nbsp;RPZ/BACK FLOW TYPE DEVICES.&nbsp;&nbsp;A COPY OF THE CERTIFICATION(S) MUST BE RECEIVED IN THIS OFFICE ONCE COMPLETED AND BEFORE FINAL INSPECTION IS PASSED. OWNER OR LICENSED PLUMBER MUST PROVIDE UTILITIES A COPY OF ANNUAL TEST AND INSPECTION RESULTS<o:p></o:p></span></p><p class="MsoNormal"><span style="color: rgb(26, 26, 26); background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial;"><br></span></p><p class="MsoNormal"><span style="color: rgb(26, 26, 26); background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial;"></span></p><p class="MsoNormal"><span style="color: rgb(26, 26, 26); background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial;">PERMITTEE/OWNER MUST OBTAIN CITRUS COUNTY RIGHT OF WAY UTILIZATION PERMIT PRIOR TO CCU (CITRUS COUNTY UTILITIES) WITNESSING ANY WET TAPS TO THE WATER OR FORCE MAIN SEWER LINE.&nbsp;&nbsp;&nbsp;COPY OF PERMIT MUST BE RECEIVED BY CCU.&nbsp;<o:p></o:p></span></p><p class="MsoNormal"><span style="color: rgb(26, 26, 26); background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial;"><br></span></p><p class="MsoNormal"><span style="color: rgb(26, 26, 26); background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial;"><span style="font-size: 12pt; line-height: 18.4px; font-family: Calibri, sans-serif;">FOLLOWING FINAL INSPECTIONS AND COMPLETION OF WORK, PROJECT ENGINEER SHALL SUBMIT A CERTIFICATION OF PROJECT COMPLETION TO INCLUDE A STATEMENT OF CERTIFICATION THAT ALL CONSTRUCTION IS COMPLETE IN ACCORDANCE WITH MINIMIUM STANDARDS AND THE PLANS AND SPECIFICATIONS.&nbsp; PROVIDE AS-BUILT RECORD DRAWINGS TO CCU, INCLUDING TWO SETS OF 24” X 36” BLUELINE DRAWINGS AND ONE SET OF HALF-SIZE PLANS, SIGNED AND SEALED BY PROJECT ENGINEER.&nbsp; FURNISH ONE DIGITAL COPY IN AUTO CAD IN R14 (OR HIGHER) FORMAT.&nbsp;&nbsp;</span></span></p></div>
Additional Information

03-24-2025Utilities Misc. 03-24-2025
<div><span style="font-size: 12pt; line-height: 18.4px; font-family: Calibri, sans-serif;">PROJECT MUST CONNECT TO CITRUS COUNTY'S CENTRAL WATER AND/OR SEWER SYSTEMS AS SHOWN ON THE FINAL APPROVED SITE PLANS.&nbsp;</span></div><div><br></div><div><p class="MsoNormal"><span style="color: rgb(26, 26, 26); background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial;">ALL WET TAPS, PRESSURE TESTS, BACTERIAL TESTING AND LIFT STATION START UPS MUST BE WITNESSED BY CCUD AND MUST BE SCHEDULED 48 HOURS IN ADVANCE BY APPOINTMENT (MONDAY - THURSDAY). PLEASE CALL (352) 527-7650 AND PRESS 4 TO SCHEDULE.&nbsp;&nbsp;<o:p></o:p></span></p><p class="MsoNormal"><span style="color: rgb(26, 26, 26); background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial;"><br></span></p><p class="MsoNormal"><span style="color: rgb(26, 26, 26); background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial;"></span></p><p class="MsoNormal"><span style="color: rgb(26, 26, 26); background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial;">ALL BACKFLOW PREVENTION DEVICES SHALL BE TESTED AND APPROVED BY A CERTIFIED PLUMBING CONTRACTOR CERTIFIED BY THE STATE OF FLORIDA AND/OR APPROVED BY THE CITRUS COUNTY.&nbsp;&nbsp;PERMITTEE/OWNER MUST SUPPLY, INSTALL, TEST AND CERTIFY&nbsp;<b>ANY AND ALL</b>&nbsp;RPZ/BACK FLOW TYPE DEVICES.&nbsp;&nbsp;A COPY OF THE CERTIFICATION(S) MUST BE RECEIVED IN THIS OFFICE ONCE COMPLETED AND BEFORE FINAL INSPECTION IS PASSED. OWNER OR LICENSED PLUMBER MUST PROVIDE UTILITIES A COPY OF ANNUAL TEST AND INSPECTION RESULTS<o:p></o:p></span></p><p class="MsoNormal"><span style="color: rgb(26, 26, 26); background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial;"><br></span></p><p class="MsoNormal"><span style="color: rgb(26, 26, 26); background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial;"></span></p><p class="MsoNormal"><span style="color: rgb(26, 26, 26); background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial;">PERMITTEE/OWNER MUST OBTAIN CITRUS COUNTY RIGHT OF WAY UTILIZATION PERMIT PRIOR TO CCU (CITRUS COUNTY UTILITIES) WITNESSING ANY WET TAPS TO THE WATER OR FORCE MAIN SEWER LINE.&nbsp;&nbsp;&nbsp;COPY OF PERMIT MUST BE RECEIVED BY CCU.&nbsp;<o:p></o:p></span></p><p class="MsoNormal"><span style="color: rgb(26, 26, 26); background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial;"><br></span></p><p class="MsoNormal"><span style="color: rgb(26, 26, 26); background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial;"><span style="font-size: 12pt; line-height: 18.4px; font-family: Calibri, sans-serif;">FOLLOWING FINAL INSPECTIONS AND COMPLETION OF WORK, PROJECT ENGINEER SHALL SUBMIT A CERTIFICATION OF PROJECT COMPLETION TO INCLUDE A STATEMENT OF CERTIFICATION THAT ALL CONSTRUCTION IS COMPLETE IN ACCORDANCE WITH MINIMIUM STANDARDS AND THE PLANS AND SPECIFICATIONS.&nbsp; PROVIDE AS-BUILT RECORD DRAWINGS TO CCU, INCLUDING TWO SETS OF 24” X 36” BLUELINE DRAWINGS AND ONE SET OF HALF-SIZE PLANS, SIGNED AND SEALED BY PROJECT ENGINEER.&nbsp; FURNISH ONE DIGITAL COPY IN AUTO CAD IN R14 (OR HIGHER) FORMAT.&nbsp;&nbsp;</span></span></p></div>

Review Consolidation Request for Information
| Assigned to Reviewer: JULIA VASCIMINI julia.vascimini@citrusbocc.com |
Review Distribution Approved
| Assigned to Reviewer: JULIA VASCIMINI julia.vascimini@citrusbocc.com |
Site Review Approved
| Assigned to Reviewer: Kellianne Caudill Kellianne.Caudill@citrusbocc.com |
Review Consolidation Approved
| Assigned to Reviewer: JULIA VASCIMINI julia.vascimini@citrusbocc.com |
Pre Permit Issuance Review Missing Information
| Assigned to Reviewer: JULIA VASCIMINI julia.vascimini@citrusbocc.com |
Additional Information

06-30-2025PERMIT REVIEW COMMENT
ALL SUBS NEED TO BE SIGNED ON PRIOR TO ISSUANCE

Pre Permit Issuance Review Missing Information
| Assigned to Reviewer: JULIA VASCIMINI julia.vascimini@citrusbocc.com |
Additional Information

07-25-2025PERMIT REVIEW COMMENT
SUBS ARE NOT REGISTERED WITH CITRUS COUNTY

Pre Permit Issuance Review Add Fees
| Assigned to Reviewer: JULIA VASCIMINI julia.vascimini@citrusbocc.com |
Pre Permit Issuance Review Approved
| Assigned to Reviewer: JULIA VASCIMINI julia.vascimini@citrusbocc.com |
NOC Review Approved
| Assigned to Reviewer: JULIA VASCIMINI julia.vascimini@citrusbocc.com |
Land Assessment Review Complete

Finalization Review Approved


Conditions

Inspections
1st Rough Plumbing Inspection (#1)Scheduled For: 10-22-2025Is Assigned Passed on 10-22-2025
| Assigned to Inspector: Vincent McCrave |
1st Rough Plumbing Inspection (#1)Scheduled For: 09-15-2025Is Assigned Passed on 09-15-2025PARTIAL
| Assigned to Inspector: Vincent McCrave |
Violations

09-15-2025See Violation Details in Comments Complied09-15-2025
See plan mark-ups, partial for sanitary only. 4" branch drain required in 3 locations. will check on next inspection.

1st Rough Plumbing Inspection (#2)Scheduled For: 09-18-2025Is Assigned Passed on 09-18-2025
| Assigned to Inspector: Steven Chmura |
Courtesy Inspection (#1)Scheduled For: 10-09-2025Is Assigned Closed on 10-08-2025
| Assigned to Inspector: Samuel Acosta |
Courtesy Inspection (#1)Scheduled For: 12-23-2025Is Assigned Passed on 12-23-2025
Passed-12-23-2025. Inspection for above ceiling sprinkler lines &amp; penetrations in three room requested by GC. They are looking to put the drop ceiling in and bring in equipment for the rooms. They are looking for their TCO and were instructed that other things will need to be addressed before hand.&nbsp;<div><p class="x_elementToProof" style="margin: 0in; color: rgb(36, 36, 36); font-family: Aptos, sans-serif; font-size: 11pt;"><b data-olk-copy-source="MessageBody">Jeremy Collins</b></p><p class="x_elementToProof" style="margin: 0in; color: rgb(36, 36, 36); font-family: Aptos, sans-serif; font-size: 11pt;"><b>Fire Plans Examiner/ Inspector | Citrus County Fire Rescue</b></p><p class="x_elementToProof" style="margin: 0in; color: rgb(36, 36, 36); font-family: Aptos, sans-serif; font-size: 11pt;">Website:&nbsp;<span style="border: 0px; font: inherit; margin: 0px; padding: 0px; vertical-align: baseline; color: rgb(70, 120, 134);"><u><a data-auth="NotApplicable" rel="noopener noreferrer" target="_blank" href="http://www.citruscountyfire.com/" data-linkindex="0" title="http://www.citruscountyfire.com/" style="border: 0px; font: inherit; margin: 0px; padding: 0px; vertical-align: baseline; color: rgb(70, 120, 134);">www.citruscountyfire.com</a></u></span></p><p class="x_elementToProof" style="margin: 0in; color: rgb(36, 36, 36); font-family: Aptos, sans-serif; font-size: 11pt;">Phone: 352-201-8844</p><p class="x_elementToProof" style="margin: 0in; color: rgb(36, 36, 36); font-family: Aptos, sans-serif; font-size: 11pt;">Email:&nbsp;<span style="border: 0px; font: inherit; margin: 0px; padding: 0px; vertical-align: baseline; color: rgb(70, 120, 134);"><u><a href="mailto:Jeremy.Collins@citruscountyfire.com" data-linkindex="1" title="mailto:Jeremy.Collins@citruscountyfire.com" style="border: 0px; font: inherit; margin: 0px; padding: 0px; vertical-align: baseline; color: rgb(70, 120, 134);">Jeremy.Collins@citruscountyfire.com</a></u></span></p></div><div><br></div>
Courtesy Inspection (#1)Scheduled For: 01-12-2026 Closed on 01-12-2026
THIS INSPECTION WAS NOT ASSIGNED.&nbsp; JEREMY CALLED TO HAVE AN ABOVE CEILING ASSIGNED TO HIM SO THAT HE CAN RESULT.&nbsp; DIDN'T SEE THIS TILL AFTER I ADDED ANOTHER COURTESY.
Courtesy Inspection (#1)Scheduled For: 01-08-2026Is Assigned Passed on 01-12-2026
Passed-1-8-2026
Final Building Inspection (#1)Scheduled For: 12-29-2025Is Assigned Partial Passed on 12-29-2025PARTIAL
| Assigned to Inspector: Peter Giverc |<div><br></div><div>OK to TCO for Ct, Xray, and Lab .</div>
Final Building Inspection (#2)Scheduled For: 01-27-2026Is Assigned Passed on 01-28-2026
| Assigned to Inspector: David Crum |
Footing Inspection (#1)Scheduled For: 09-03-2025Is Assigned Passed on 09-03-2025
| Assigned to Inspector: Vincent McCrave |
Violations

09-03-2025See Violation Details in Comments Complied09-03-2025
Inspection passed for all interior footings and 3 for porta.

Footing Inspection (#1)Scheduled For: 09-09-2025Is Assigned Passed on 09-09-2025
| Assigned to Inspector: Peter Giverc |
Footing Inspection (#1)Scheduled For: 09-11-2025Is Assigned Passed on 09-11-2025
| Assigned to Inspector: Vincent McCrave |
Violations

09-11-2025See Violation Details in Comments Complied09-11-2025
footing for equipment wall, passed.

Frame Inspection (#1)Scheduled For: 11-07-2025Is Assigned Passed on 11-10-2025
| Assigned to Inspector: Vincent McCrave |
Frame Inspection (#1)Scheduled For: 12-09-2025Is Assigned Passed on 12-09-2025

Lintel Inspection (#1)Scheduled For: 10-20-2025Is Assigned Passed on 10-20-2025
| Assigned to Inspector: Vincent McCrave |
Final NRS Engineering Inspection (#1)Is Assigned Failed on 01-28-2026
| Assigned to Inspector: WILLIAM A LAFLAMME (JR) |
Violations

01-28-2026Engineering Misc. Transferred to Re-inspection01-28-2026
Please provide testing data for the repair to the multi use path in accordance with the right of way permit.<div>Markings on the multi use path need to put back where the repairs are located.</div><div>Appeared that the driveway on Norvell Bryant was not finished at time of inspection.</div><div>The left turn arrow on Betty point needs to be removed, this was added to a version of the plans after Technical Services approved. Please see response to comment letter dated 4/24/25 on BLD2024340069 where it was acknowledged that the median at betty point will be restricted by another project that is currently underway.</div>

Final NRS Engineering Inspection (#2) Passed on 02-02-2026

Violations

01-28-2026Engineering Misc. Complied02-02-2026
Please provide testing data for the repair to the multi use path in accordance with the right of way permit.<div>Markings on the multi use path need to put back where the repairs are located.</div><div>Appeared that the driveway on Norvell Bryant was not finished at time of inspection.</div><div>The left turn arrow on Betty point needs to be removed, this was added to a version of the plans after Technical Services approved. Please see response to comment letter dated 4/24/25 on BLD2024340069 where it was acknowledged that the median at betty point will be restricted by another project that is currently underway.</div>

Final NRS Fire Inspection (#1)Scheduled For: 01-27-2026Is Assigned Passed on 01-27-2026
Final Fire passed 1-27-2026.
Final NRS Planning Inspection (#1)Is Assigned Failed on 01-28-2026

Violations

01-30-2026SITE MISC Transferred to Re-inspection01-28-2026
Bench and bicycle racks have not been installed.

Final NRS Planning Inspection (#2)Is Assigned Passed on 02-02-2026
Mahmoud Sbeih - Project Manager - emailed me pictures of installed bench and bicycle racks.
Violations

01-30-2026SITE MISC Complied02-02-2026
Bench and bicycle racks have not been installed.

Final NRS Utility Inspection (#1)Scheduled For: 02-02-2026Is Assigned Passed on 02-02-2026
| Assigned to Inspector: TIMOTHY J HUDSON | <div>PENDING&nbsp;&nbsp;<br><div>NEED FDEP PERMIT AND FINAL APPROVAL ON THE AS BUILTS</div></div>
Pre Electric Pre Final Inspection (#1)Scheduled For: 11-14-2025Is Assigned Passed on 11-14-2025
| Assigned to Inspector: Jeremy Lentz |
Pre Power Release (#1)Scheduled For: 11-14-2025Is Assigned Confirmed on 11-14-2025
BLD202501503 Owner Name: CITRUS MEMORIAL HOSPITAL INC Inspection Passed on: 11/14/2025
Final Power Release (#1)Scheduled For: 12-29-2025Is Assigned Confirmed on 12-29-2025
BLD202501503 Owner Name: CITRUS MEMORIAL HOSPITAL INC Inspection Passed on: 12/29/2025
Final Power Release (#1)Scheduled For: 01-26-2026Is Assigned Confirmed on 01-26-2026
BLD202501503 Owner Name: CITRUS MEMORIAL HOSPITAL INC Inspection Passed on: 1/26/2026
Rough Electric Inspection (#1)Scheduled For: 11-05-2025Is Assigned Partial Passed on 11-05-2025
| Assigned to Inspector: Jeremy Lentz |
Violations

11-05-2025See Violation Details in Comments Transferred to Re-inspection11-05-2025
Nurses station soffit only

Rough Mechanical Inspection (#1)Scheduled For: 10-22-2025Is Assigned Passed on 10-22-2025
| Assigned to Inspector: Vincent McCrave |
Violations

10-22-2025See Violation Details in Comments Complied10-22-2025
Tie-ins and mastic passed

T-Pole Inspection (#1)Scheduled For: 09-15-2025Is Assigned Passed on 09-15-2025
| Assigned to Inspector: Vincent McCrave |
T-Pole Power Release (#1)Scheduled For: 09-15-2025Is Assigned Confirmed on 09-15-2025
BLD202501503 Owner Name: CITRUS MEMORIAL HOSPITAL INC Inspection Passed on: 9/15/2025
Final Plumbing Inspection (#1)Scheduled For: 12-29-2025Is Assigned Partial Passed on 12-29-2025
| Assigned to Inspector: ANDREW F WALKER |<div><p class="MsoNormal">OK to Partial TCO for the CT ,&nbsp; Xray,&nbsp; and the lab rooms .&nbsp;<o:p></o:p></p></div>
Violations

12-29-2025See Violation Details in Comments Transferred to Re-inspection12-29-2025
OK to TCO for Ct, Xray, and Lab .

Final Plumbing Inspection (#2)Scheduled For: 01-27-2026Is Assigned Passed on 01-27-2026
| Assigned to Inspector: David Crum |
Violations

12-29-2025See Violation Details in Comments Complied01-27-2026
OK to TCO for Ct, Xray, and Lab .

Final Mechanical Inspection (#1)Scheduled For: 12-29-2025Is Assigned Partial Passed on 12-29-2025
| Assigned to Inspector: ANDREW F WALKER |<div><p class="MsoNormal">OK to Partial TCO for the CT ,&nbsp; Xray,&nbsp; and the lab rooms .&nbsp;<o:p></o:p></p></div>
Violations

12-29-2025See Violation Details in Comments Transferred to Re-inspection12-29-2025
OK to TCO for Ct, Xray, and Lab .

Final Mechanical Inspection (#2)Scheduled For: 01-23-2026Is Assigned Passed on 01-27-2026
| Assigned to Inspector: ANDREW F WALKER | <div>STAND ALONE ER</div><div>BRUCE 407-340-4156</div>
Violations

12-29-2025See Violation Details in Comments Complied01-27-2026
OK to TCO for Ct, Xray, and Lab .

Final Electric Inspection (#1)Scheduled For: 12-29-2025Is Assigned Passed on 12-29-2025
| Assigned to Inspector: Jeremy Lentz |
Violations

12-29-2025See Violation Details in Comments Complied12-29-2025
CT, X-Ray, Lab only.

Final Electric Inspection (#1)Scheduled For: 01-23-2026Is Assigned Passed on 01-26-2026
| Assigned to Inspector: ANDREW F WALKER | <div>STAND ALONE ER</div><div>BRUCE 407-340-4156</div>
Above Ceiling - Electrical Inspection (#1)Scheduled For: 12-09-2025Is Assigned Passed on 12-09-2025

Above Ceiling - Electrical Inspection (#1)Scheduled For: 12-23-2025Is Assigned Partial Passed on 12-23-2025
| Assigned to Inspector: ANDREW F WALKER |
Violations

12-23-2025See Violation Details in Comments Transferred to Re-inspection12-23-2025
CT , Xray and lab room

Above Ceiling - Electrical Inspection (#1)Scheduled For: 01-08-2026Is Assigned Passed on 01-08-2026
| Assigned to Inspector: ANDREW F WALKER |
Above Ceiling - Plumbing Inspection (#1)Scheduled For: 01-08-2026Is Assigned Passed on 01-08-2026
| Assigned to Inspector: ANDREW F WALKER |
Above Ceiling - Mechanical Inspection (#1)Scheduled For: 12-23-2025Is Assigned Partial Passed on 12-23-2025
| Assigned to Inspector: ANDREW F WALKER |
Violations

12-23-2025See Violation Details in Comments Transferred to Re-inspection12-23-2025
CT, Xray , Lab rooms

Above Ceiling - Mechanical Inspection (#1)Scheduled For: 01-08-2026Is Assigned Passed on 01-08-2026
| Assigned to Inspector: ANDREW F WALKER |
Underground Electric Inspection (#1)Scheduled For: 09-29-2025Is Assigned Passed on 09-29-2025
| Assigned to Inspector: Vincent McCrave |
Structural Steel Certificate (#1) Closed