Permit Specialist Review
Approved
Addressing Review
Approved
Engineering FFEA Review
Request for Information
11-04-2024Engineering Misc.
Pending review and approval of stormwater management plan.
Engineering Stormwater Review
Request for Information
10-24-2024Stormwater Management Plan Req
<p class="MsoNormal" style="margin-bottom:0in">Per Citrus County Ordinance
2022-A29, a Stormwater Plan is Required.<o:p></o:p></p>
<p class="MsoNormal" style="margin-bottom:0in"><o:p> </o:p></p>
<p class="MsoNormal" style="margin-bottom:0in">Please submit a Stormwater Plan
prepared by a professional engineer licensed in the State of Florida, providing
all the items listed in the Land Development Code, Chapter 6, Section 6420.A
& B.2.<o:p></o:p></p>
Flood Review
Request for Information
<div>FLOOD ZONE: AE - BFE: 41.0, DFE: 42.0 (PANEL: 12017C0228D, EFFECTIVE: 09/26/2014 - 120063) - STRUCTURE LOCATED IN ZONE: AE</div><div><br></div><div>SPOT ELEVATION/FLOOD ZONE DELINEATION SURVEY DOES NOT CONTAIN AN ACTIVE DIGITIAL CERTIFICATION - PROVIDE UPDATED, ACTIVE SIGNED AND SEALED SURVEY (REQUIRED 2021, CCCO SEC 18-193 - FBC R322.1.4.1) </div><div><br></div><div>PURSUANT TO CCCO SEC 18-193, SEC 18-208 –</div><div>(a)<span style="white-space: pre"> </span>GENERAL. ALL MANUFACTURED HOMES INSTALLED IN FLOOD HAZARD AREAS SHALL BE INSTALLED BY AN INSTALLER THAT IS LICENSED PURSUANT TO F.S. § 320.8249, AND SHALL COMPLY WITH THE REQUIREMENTS OF CHAPTER 15C-1, F.A.C. AND THE REQUIREMENTS OF THIS ARTICLE…</div><div>(b)<span style="white-space: pre"> </span>FOUNDATIONS. ALL NEW MANUFACTURED HOMES AND REPLACEMENT MANUFACTURED HOMES INSTALLED IN FLOOD HAZARD AREAS SHALL BE INSTALLED ON PERMANENT, REINFORCED FOUNDATIONS THAT:</div><div><ul><li>(1)<span style="white-space: pre"> </span>IN FLOOD HAZARD AREAS (ZONE A) OTHER THAN COASTAL HIGH HAZARD AREAS, ARE DESIGNED IN ACCORDANCE WITH THE FOUNDATION REQUIREMENTS OF THE FLORIDA BUILDING CODE, RESIDENTIAL SECTION R322.2 AND THIS ARTICLE.</li><li>(2)<span style="white-space: pre"> </span>IN COASTAL HIGH HAZARD AREAS (ZONE V), ARE DESIGNED IN ACCORDANCE WITH THE FOUNDATION REQUIREMENTS OF THE FLORIDA BUILDING CODE, RESIDENTIAL SECTION R322.3 AND THIS ARTICLE.</li></ul></div><div>(c)<span style="white-space: pre"> </span>ANCHORING. ALL NEW MANUFACTURED HOMES AND REPLACEMENT MANUFACTURED HOMES SHALL BE INSTALLED USING METHODS AND PRACTICES WHICH MINIMIZE FLOOD DAMAGE AND SHALL BE SECURELY ANCHORED TO AN ADEQUATELY ANCHORED FOUNDATION SYSTEM TO RESIST FLOTATION, COLLAPSE OR LATERAL MOVEMENT. METHODS OF ANCHORING INCLUDE, BUT ARE NOT LIMITED TO, USE OF OVER-THE-TOP OR FRAME TIES TO GROUND ANCHORS. THIS ANCHORING REQUIREMENT IS IN ADDITION TO APPLICABLE STATE AND LOCAL ANCHORING REQUIREMENTS FOR WIND RESISTANCE.</div><div>(d)<span style="white-space: pre"> </span>ELEVATION. ALL MANUFACTURED HOMES THAT ARE PLACED, REPLACED, OR SUBSTANTIALLY IMPROVED IN FLOOD HAZARD AREAS SHALL BE ELEVATED SUCH THAT THE BOTTOM OF THE FRAME IS AT OR ABOVE THE ELEVATION REQUIRED, AS APPLICABLE TO THE FLOOD HAZARD AREA, IN THE FLORIDA BUILDING CODE, RESIDENTIAL SECTION R3222.2 (ZONE A) OR SECTION R322.3 (ZONE V AND COASTAL A ZONE).</div><div>(e)<span style="white-space: pre"> </span>ENCLOSURES. ENCLOSED AREAS BELOW ELEVATED MANUFACTURED HOMES SHALL COMPLY WITH THE REQUIREMENTS OF THE FLORIDA BUILDING CODE, RESIDENTIAL SECTION R322 FOR SUCH ENCLOSED AREAS, AS APPLICABLE TO THE FLOOD HAZARD AREA.</div><div>(f)<span style="white-space: pre"> </span>UTILITY EQUIPMENT. UTILITY EQUIPMENT THAT SERVES MANUFACTURED HOMES, INCLUDING ELECTRIC, HEATING, VENTILATION, PLUMBING, AND AIR CONDITIONING EQUIPMENT AND OTHER SERVICE FACILITIES, SHALL COMPLY WITH THE REQUIREMENTS OF THE FLORIDA BUILDING CODE, RESIDENTIAL SECTION R322, AS APPLICABLE TO THE FLOOD HAZARD AREA.</div><div><br></div><div>PROVIDE ARCHITECTURAL/ENGINEERED PLANS FOR A PERMENANT FOUNDATION THAT MEETS THE CITED CODE REFERENCES FOR FBC R322.2. SUCH PLANS SHOULD INCLUDE PROPOSED COMPLIANCE MEASURES AS FOLLOWS AND AS APPLICABLE: </div><div>•<span style="white-space: pre"> </span>BFE & DFE ELEVATIONS STATED AND SHOWN ON PLANS (CCCO SEC 18-193 - FBC R322.1.4.1, CCCO SEC 18-193 - FBC R322.1)</div><div>•<span style="white-space: pre"> </span>STATEMENT ON PLANS STATING WHAT FLOOD ZONE THE HOUSE IS IN (CCCO SEC 18-193 - FBC R322.2, CCCO SEC 18-193 - FBC R322.3 - DETERMINES WHICH REQUIREMENTS MUST BE MET)</div><div>•<span style="white-space: pre"> </span>STATEMENT ON PLANS THAT ALL MECHANICAL, ELECTRICAL, AND PLUMBING EQUIPMENT IS TO BE AT OR ABOVE DFE (CCCO SEC 18-193 - FBC R322.1.6, FEMA P-348, PAGES 3-8)</div><div>•<span style="white-space: pre"> </span>ANY ELECTRICAL BELOW DFE MUST STATE NEMA 6 REQUIRED (CCCO SEC 18-193 - FBC R322.1.6 & ASCE 24-14 7.2.5)<br></div>
11-22-2024Flood Misc.
<div>FLOOD ZONE: AE - BFE: 41.0, DFE: 42.0 (PANEL: 12017C0228D, EFFECTIVE: 09/26/2014 - 120063) - STRUCTURE LOCATED IN ZONE: AE</div><div><br></div><div>SPOT ELEVATION/FLOOD ZONE DELINEATION SURVEY DOES NOT CONTAIN AN ACTIVE DIGITIAL CERTIFICATION - PROVIDE UPDATED, ACTIVE SIGNED AND SEALED SURVEY (REQUIRED 2021, CCCO SEC 18-193 - FBC R322.1.4.1) </div><div><br></div><div>PURSUANT TO CCCO SEC 18-193, SEC 18-208 –</div><div>(a)<span style="white-space:pre"> </span>GENERAL. ALL MANUFACTURED HOMES INSTALLED IN FLOOD HAZARD AREAS SHALL BE INSTALLED BY AN INSTALLER THAT IS LICENSED PURSUANT TO F.S. § 320.8249, AND SHALL COMPLY WITH THE REQUIREMENTS OF CHAPTER 15C-1, F.A.C. AND THE REQUIREMENTS OF THIS ARTICLE…</div><div>(b)<span style="white-space:pre"> </span>FOUNDATIONS. ALL NEW MANUFACTURED HOMES AND REPLACEMENT MANUFACTURED HOMES INSTALLED IN FLOOD HAZARD AREAS SHALL BE INSTALLED ON PERMANENT, REINFORCED FOUNDATIONS THAT:</div><div>(1)<span style="white-space:pre"> </span>IN FLOOD HAZARD AREAS (ZONE A) OTHER THAN COASTAL HIGH HAZARD AREAS, ARE DESIGNED IN ACCORDANCE WITH THE FOUNDATION REQUIREMENTS OF THE FLORIDA BUILDING CODE, RESIDENTIAL SECTION R322.2 AND THIS ARTICLE.</div><div>(2)<span style="white-space:pre"> </span>IN COASTAL HIGH HAZARD AREAS (ZONE V), ARE DESIGNED IN ACCORDANCE WITH THE FOUNDATION REQUIREMENTS OF THE FLORIDA BUILDING CODE, RESIDENTIAL SECTION R322.3 AND THIS ARTICLE.</div><div>(c)<span style="white-space:pre"> </span>ANCHORING. ALL NEW MANUFACTURED HOMES AND REPLACEMENT MANUFACTURED HOMES SHALL BE INSTALLED USING METHODS AND PRACTICES WHICH MINIMIZE FLOOD DAMAGE AND SHALL BE SECURELY ANCHORED TO AN ADEQUATELY ANCHORED FOUNDATION SYSTEM TO RESIST FLOTATION, COLLAPSE OR LATERAL MOVEMENT. METHODS OF ANCHORING INCLUDE, BUT ARE NOT LIMITED TO, USE OF OVER-THE-TOP OR FRAME TIES TO GROUND ANCHORS. THIS ANCHORING REQUIREMENT IS IN ADDITION TO APPLICABLE STATE AND LOCAL ANCHORING REQUIREMENTS FOR WIND RESISTANCE.</div><div>(d)<span style="white-space:pre"> </span>ELEVATION. ALL MANUFACTURED HOMES THAT ARE PLACED, REPLACED, OR SUBSTANTIALLY IMPROVED IN FLOOD HAZARD AREAS SHALL BE ELEVATED SUCH THAT THE BOTTOM OF THE FRAME IS AT OR ABOVE THE ELEVATION REQUIRED, AS APPLICABLE TO THE FLOOD HAZARD AREA, IN THE FLORIDA BUILDING CODE, RESIDENTIAL SECTION R3222.2 (ZONE A) OR SECTION R322.3 (ZONE V AND COASTAL A ZONE).</div><div>(e)<span style="white-space:pre"> </span>ENCLOSURES. ENCLOSED AREAS BELOW ELEVATED MANUFACTURED HOMES SHALL COMPLY WITH THE REQUIREMENTS OF THE FLORIDA BUILDING CODE, RESIDENTIAL SECTION R322 FOR SUCH ENCLOSED AREAS, AS APPLICABLE TO THE FLOOD HAZARD AREA.</div><div>(f)<span style="white-space:pre"> </span>UTILITY EQUIPMENT. UTILITY EQUIPMENT THAT SERVES MANUFACTURED HOMES, INCLUDING ELECTRIC, HEATING, VENTILATION, PLUMBING, AND AIR CONDITIONING EQUIPMENT AND OTHER SERVICE FACILITIES, SHALL COMPLY WITH THE REQUIREMENTS OF THE FLORIDA BUILDING CODE, RESIDENTIAL SECTION R322, AS APPLICABLE TO THE FLOOD HAZARD AREA.</div><div><br></div><div>PROVIDE ARCHITECTURAL/ENGINEERED PLANS FOR A PERMENANT FOUNDATION THAT MEETS THE CITED CODE REFERENCES FOR FBC R322.2. SUCH PLANS SHOULD INCLUDE PROPOSED COMPLIANCE MEASURES AS FOLLOWS AND AS APPLICABLE: </div><div>•<span style="white-space:pre"> </span>BFE & DFE ELEVATIONS STATED AND SHOWN ON PLANS (CCCO SEC 18-193 - FBC R322.1.4.1, CCCO SEC 18-193 - FBC R322.1)</div><div>•<span style="white-space:pre"> </span>STATEMENT ON PLANS STATING WHAT FLOOD ZONE THE HOUSE IS IN (CCCO SEC 18-193 - FBC R322.2, CCCO SEC 18-193 - FBC R322.3 - DETERMINES WHICH REQUIREMENTS MUST BE MET)</div><div>•<span style="white-space:pre"> </span>STATEMENT ON PLANS THAT ALL MECHANICAL, ELECTRICAL, AND PLUMBING EQUIPMENT IS TO BE AT OR ABOVE DFE (CCCO SEC 18-193 - FBC R322.1.6, FEMA P-348, PAGES 3-8)</div><div>•<span style="white-space:pre"> </span>ANY ELECTRICAL BELOW DFE MUST STATE NEMA 6 REQUIRED (CCCO SEC 18-193 - FBC R322.1.6 & ASCE 24-14 7.2.5)</div>
Plans Examiner Review
Approved
Driveway Review
Request for Information
10-30-2024Show D/W Apron Location on Site Plan
Must show apron location and dimensions on site plan.
Site Review
Request for Information
10-25-2024SITE MISC
site plan does not match property
10-30-2024SITE MISC
MUST SHOW STAIRS ON THE SITE PLAN AND DRIVEWAY APRON
Utility Review
Approved
Well & Septic
10-29-2024DigEplan Review
10-29-2024
IF FUTURE CENTRAL WATER AND/OR SEWER BECOMES AVAILABLE LOT WILL BE REQUIRED TO CONNECT WITHIN 365 DAYS OF NOTIFICATION
Environmental Health Review
Approved
Septic System approval must be provided at time of final inspection prior to CO issuance.
Review Consolidation
Request for Information
| Assigned to Reviewer: Gabe Donovan gabe.donovan@citrusbocc.com |
Review Distribution
Missing Information
| Assigned to Reviewer: Gabe Donovan gabe.donovan@citrusbocc.com |
12-02-2024PERMIT REVIEW COMMENT
Please address all denial comments. Please upload a resubmittal cover sheet identifying revisions made.
Review Distribution
Missing Information
12-03-2024PERMIT REVIEW COMMENT
Previous comments not addressed. Please address all denial comments. Please upload a resubmittal cover sheet identifying revisions made.
Review Distribution
Approved
| Assigned to Reviewer: Gabe Donovan gabe.donovan@citrusbocc.com |
Engineering FFEA Review
Request for Information
| Assigned to Reviewer: LORRIE L SCHWENNEKER lorrie.schwenneker@citrusbocc.com |
12-23-2024Engineering Misc.
Pending review and approval of the stormwater management plan.
Engineering Stormwater Review
Request for Information
| Assigned to Reviewer: QUINCY D WYLUPEK quincy.wylupek@citrusbocc.com |
12-13-2024Stormwater Problems
See comments on SW Plan or in Review Report.
Flood Review
Request for Information
PREVIOUS COMMENTS NOT ADDRESSED:<div><div>PROVIDE ARCHITECTURAL/ENGINEERED PLANS FOR A PERMENANT FOUNDATION THAT MEETS THE CITED CODE REFERENCES FOR FBC R322.2. SUCH PLANS SHOULD INCLUDE PROPOSED COMPLIANCE MEASURES AS FOLLOWS AND AS APPLICABLE: </div><div>•<span style="white-space: pre;"> </span>BFE, DFE, AND GRADE ELEVATIONS STATED AND SHOWN ON PLANS (CCCO SEC 18-193 - FBC R322.1.4.1, CCCO SEC 18-193 - FBC R322.1)</div><div>•<span style="white-space: pre;"> </span>STATEMENT ON PLANS STATING WHAT FLOOD ZONE THE HOUSE IS IN (CCCO SEC 18-193 - FBC R322.2, CCCO SEC 18-193 - FBC R322.3)</div><div>•<span style="white-space: pre;"> </span>STATEMENT ON PLANS THAT ALL MECHANICAL, ELECTRICAL, AND PLUMBING EQUIPMENT IS TO BE AT OR ABOVE DFE (CCCO SEC 18-193 - FBC R322.1.6, FEMA P-348, PAGES 3-8</div></div>
12-20-2024Flood Misc.
PREVIOUS COMMENTS NOT ADDRESSED:<div><div>PROVIDE ARCHITECTURAL/ENGINEERED PLANS FOR A PERMENANT FOUNDATION THAT MEETS THE CITED CODE REFERENCES FOR FBC R322.2. SUCH PLANS SHOULD INCLUDE PROPOSED COMPLIANCE MEASURES AS FOLLOWS AND AS APPLICABLE: </div><div>•<span style="white-space: pre;"> </span>BFE, DFE, AND GRADE ELEVATIONS STATED AND SHOWN ON PLANS (CCCO SEC 18-193 - FBC R322.1.4.1, CCCO SEC 18-193 - FBC R322.1)</div><div>•<span style="white-space: pre;"> </span>STATEMENT ON PLANS STATING WHAT FLOOD ZONE THE HOUSE IS IN (CCCO SEC 18-193 - FBC R322.2, CCCO SEC 18-193 - FBC R322.3)</div><div>•<span style="white-space: pre;"> </span>STATEMENT ON PLANS THAT ALL MECHANICAL, ELECTRICAL, AND PLUMBING EQUIPMENT IS TO BE AT OR ABOVE DFE (CCCO SEC 18-193 - FBC R322.1.6, FEMA P-348, PAGES 3-8</div></div>
Driveway Review
Approved
Swale'd apron to allow for proper drainage from high to low side of entire property frontage within the ROW.
Site Review
Approved
SITE PLAN APPROVED FOR MH ONLY, 49 TREES TO BE RETAINED ON SITE**
Review Consolidation
Request for Information
| Assigned to Reviewer: Gabe Donovan gabe.donovan@citrusbocc.com |
Review Distribution
Approved
| Assigned to Reviewer: Gabe Donovan gabe.donovan@citrusbocc.com |
Engineering FFEA Review
Approved
| Assigned to Reviewer: LORRIE L SCHWENNEKER lorrie.schwenneker@citrusbocc.com |
Engineering Stormwater Review
Approved
| Assigned to Reviewer: QUINCY D WYLUPEK quincy.wylupek@citrusbocc.com |
Flood Review
Request for Information
PREVIOUS COMMENTS NOT ADDRESSED:<div><div>PROVIDE ARCHITECTURAL/ENGINEERED PLANS FOR A PERMENANT FOUNDATION THAT MEETS THE CITED CODE REFERENCES FOR FBC R322.2. SUCH PLANS SHOULD INCLUDE PROPOSED COMPLIANCE MEASURES AS FOLLOWS AND AS APPLICABLE: </div><div>•<span style="white-space: pre;"> </span>BFE, DFE, AND GRADE ELEVATIONS STATED AND SHOWN ON PLANS (CCCO SEC 18-193 - FBC R322.1.4.1, CCCO SEC 18-193 - FBC R322.1)</div><div>•<span style="white-space: pre;"> </span>STATEMENT ON PLANS STATING WHAT FLOOD ZONE THE HOUSE IS IN (CCCO SEC 18-193 - FBC R322.2, CCCO SEC 18-193 - FBC R322.3)</div><div>•<span style="white-space: pre;"> </span>STATEMENT ON PLANS THAT BOTTOM OF FRAME AND ALL MECHANICAL, ELECTRICAL, AND PLUMBING EQUIPMENT IS TO BE AT OR ABOVE DFE (CCCO SEC 18-193 - FBC R322.1.6, FEMA P-348, PAGES 3-8</div></div><div>FOUNDATION PLANS MUST CERTIFY THAT PLACEMENT/SET UP WILL RESIST FLOTATION AND LATERAL SHIFT.</div>
12-30-2024Flood Misc.
PREVIOUS COMMENTS NOT ADDRESSED:<div><div>PROVIDE ARCHITECTURAL/ENGINEERED PLANS FOR A PERMENANT FOUNDATION THAT MEETS THE CITED CODE REFERENCES FOR FBC R322.2. SUCH PLANS SHOULD INCLUDE PROPOSED COMPLIANCE MEASURES AS FOLLOWS AND AS APPLICABLE: </div><div>•<span style="white-space: pre"> </span>BFE, DFE, AND GRADE ELEVATIONS STATED AND SHOWN ON PLANS (CCCO SEC 18-193 - FBC R322.1.4.1, CCCO SEC 18-193 - FBC R322.1)</div><div>•<span style="white-space: pre"> </span>STATEMENT ON PLANS STATING WHAT FLOOD ZONE THE HOUSE IS IN (CCCO SEC 18-193 - FBC R322.2, CCCO SEC 18-193 - FBC R322.3)</div><div>•<span style="white-space: pre"> </span>STATEMENT ON PLANS THAT BOTTOM OF FRAME AND ALL MECHANICAL, ELECTRICAL, AND PLUMBING EQUIPMENT IS TO BE AT OR ABOVE DFE (CCCO SEC 18-193 - FBC R322.1.6, FEMA P-348, PAGES 3-8</div></div><div>FOUNDATION PLANS MUST CERTIFY THAT PLACEMENT/SET UP WILL RESIST FLOTATION AND LATERAL SHIFT.</div>
Review Consolidation
Request for Information
| Assigned to Reviewer: Gabe Donovan gabe.donovan@citrusbocc.com |
Review Distribution
Approved
| Assigned to Reviewer: Gabe Donovan gabe.donovan@citrusbocc.com |
Flood Review
Request for Information
<p><b>FLOOD ZONE: AE/X - BFE: 41.0, DFE: 42.0 (PANEL: 12017C0228D, EFFECTIVE: 09/26/2014 - 120063) - STRUCTURE LOCATED IN ZONE: AE</b></p><p><span style="font-size: 1em"><br></span></p><p><span style="font-size: 1em"><font color="#000000">PURSUANT TO CCCO SEC 18-208 - </font></span></p><p><span style="font-size: 1em"><font color="#000000"><br></font></span></p><p><font color="#000000">MANUFACTURED HOMES PLACED IN THE SPECIAL FLOOD HAZARD AREA SHALL HAVE PERMENANT, ENGINEERED FOUNDATIONS THAT COMPLY WITH THE PROVISIONS OF FBC R322. PROVIDE ARCHITECTURAL/ENGINEERED PLANS THAT COMPLY WITH THE CODE REQUIREMENTS (CCCO SEC 18-208 (B) & (C))</font></p><ul><li><font color="#000000">PLANS MUST SPECIFY THAT THE BOTTOM OF THE MANUFACTURED HOME FOUNDATION FRAME SHALL MEET THE REQUIRED DESIGN FLOOD ELEVATION. </font></li><li><font color="#000000">PLANS MUST SPECIFY THAT THE STRUCTURE IS ADEQUATELY ANCHORED TO THE FOUNDATION SYSTEM TO RESIST FLOTATION, COLLAPSE AND OR LATERAL MOVEMENT. </font></li></ul><p><font color="#000000">PLANS MUST INCLUDE COMPLIANCE MEASURES AND SPECIFICATIONS FOR MECHANICAL, ELECTRICAL, AND PLUMBING EQUIPMENT (CCCO SEC 18-208 (F))</font></p><ul><li><font color="#000000">REQUIRED STATEMENT ON PLANS FOR WHAT FLOOD ZONE THE STRUCTURE IS LOCATED IN (CCCO SEC 18-193 - FBC R322.2, CCCO SEC 18-193 - FBC R322.3 - DETERMINES WHICH REQUIREMENTS MUST BE MET)</font></li><li><font color="#000000">STATEMENT ON PLANS THAT ALL MECHANICAL, ELECTRICAL, AND PLUMBING EQUIPMENT IS TO BE AT OR ABOVE DFE (CCCO SEC 18-193 - FBC R322.1.6, FEMA P-348, PAGES 3-8)</font></li><li><font color="#000000">ANY ELECTRICAL BELOW DFE MUST STATE NEMA 6 REQUIRED (CCCO SEC 18-193 - FBC R322.1.6 & ASCE 24-14 7.2.5)</font></li></ul><p><font color="#000000">ONLY PARKING, BUILDING ACCESS, OR STORAGE BELOW DFE. PERMANENT FACILITIES ARE PROHIBITED (CCCO SEC 18-192 (8) - FEMA P-348, PAGES 3-8)</font></p>
01-13-2025Flood Misc.
<p style="font-size: 12px;"><b>FLOOD ZONE: AE/X - BFE: 41.0, DFE: 42.0 (PANEL: 12017C0228D, EFFECTIVE: 09/26/2014 - 120063) - STRUCTURE LOCATED IN ZONE: AE</b></p><p style="font-size: 12px;"><span style="font-size: 1em;"><br></span></p><p style="font-size: 12px;"><span style="font-size: 1em;"><font color="#000000">PURSUANT TO CCCO SEC 18-208 - </font></span></p><p style="font-size: 12px;"><span style="font-size: 1em;"><font color="#000000"><br></font></span></p><p style="font-size: 12px;"><font color="#000000">MANUFACTURED HOMES PLACED IN THE SPECIAL FLOOD HAZARD AREA SHALL HAVE PERMENANT, ENGINEERED FOUNDATIONS THAT COMPLY WITH THE PROVISIONS OF FBC R322. PROVIDE ARCHITECTURAL/ENGINEERED PLANS THAT COMPLY WITH THE CODE REQUIREMENTS (CCCO SEC 18-208 (B) & (C))</font></p><ul><li><font color="#000000">PLANS MUST SPECIFY THAT THE BOTTOM OF THE MANUFACTURED HOME FOUNDATION FRAME SHALL MEET THE REQUIRED DESIGN FLOOD ELEVATION. </font></li><li><font color="#000000">PLANS MUST SPECIFY THAT THE STRUCTURE IS ADEQUATELY ANCHORED TO THE FOUNDATION SYSTEM TO RESIST FLOTATION, COLLAPSE AND OR LATERAL MOVEMENT. </font></li></ul><p style="font-size: 12px;"><font color="#000000">PLANS MUST INCLUDE COMPLIANCE MEASURES AND SPECIFICATIONS FOR MECHANICAL, ELECTRICAL, AND PLUMBING EQUIPMENT (CCCO SEC 18-208 (F))</font></p><ul><li><font color="#000000">REQUIRED STATEMENT ON PLANS FOR WHAT FLOOD ZONE THE STRUCTURE IS LOCATED IN (CCCO SEC 18-193 - FBC R322.2, CCCO SEC 18-193 - FBC R322.3 - DETERMINES WHICH REQUIREMENTS MUST BE MET)</font></li><li><font color="#000000">STATEMENT ON PLANS THAT ALL MECHANICAL, ELECTRICAL, AND PLUMBING EQUIPMENT IS TO BE AT OR ABOVE DFE (CCCO SEC 18-193 - FBC R322.1.6, FEMA P-348, PAGES 3-8)</font></li><li><font color="#000000">ANY ELECTRICAL BELOW DFE MUST STATE NEMA 6 REQUIRED (CCCO SEC 18-193 - FBC R322.1.6 & ASCE 24-14 7.2.5)</font></li></ul><p style="font-size: 12px;"><font color="#000000">ONLY PARKING, BUILDING ACCESS, OR STORAGE BELOW DFE. PERMANENT FACILITIES ARE PROHIBITED (CCCO SEC 18-192 (8) - FEMA P-348, PAGES 3-8)</font></p>
Plans Examiner Review
Request for Information
| Assigned to Reviewer: Peter Giverc |
01-13-2025DigEplan Review
1- Engineered plans to show pier spacing, anchor tie downs and all required connections for foundation to unit to comply with FBCR 322. plans provided show no pier spacing, anchor tie downs etc. FBCB 107.2.1
Review Consolidation
Request for Information
| Assigned to Reviewer: Gabe Donovan gabe.donovan@citrusbocc.com |
Review Distribution
Approved
| Assigned to Reviewer: Gabe Donovan gabe.donovan@citrusbocc.com |
Flood Review
Approved
FLOOD ZONE: AE/X - BFE: 41.0, DFE: 42.0 (PANEL: 12017C0228D, EFFECTIVE: 09/26/2014 - 120063) - STRUCTURE LOCATED IN ZONE: AE - BOTTOM OF MH FRAME AND ALL MACHINERY & EQUIPMENT MUST MEET DFE: 42.0' - FINISHED CONSTRUCTION ELEVATION CERTIFICATE REQUIRED PRIOR TO FINAL INSPS AND ONCE ALL MACHINERY & EQUIPMENT HAS BEEN INSTALLED (FBC 110.3 (6.1))
Plans Examiner Review
Approved
| Assigned to Reviewer: Stephen R Switzer stephen.switzer@citrusbocc.com |
Site Review
Approved
| Assigned to Reviewer: Melissa Keene-Weis Melissa.KeeneWeis@citrusbocc.com |
Review Consolidation
Approved
| Assigned to Reviewer: Gabe Donovan gabe.donovan@citrusbocc.com |
Pre Permit Issuance Review
Missing Information
| Assigned to Reviewer: Gabe Donovan gabe.donovan@citrusbocc.com |
01-27-2025PERMIT REVIEW COMMENT
Please have subs sign on
Pre Permit Issuance Review
Add Fees
| Assigned to Reviewer: Gabe Donovan gabe.donovan@citrusbocc.com |
Pre Permit Issuance Review
Approved
| Assigned to Reviewer: Gabe Donovan gabe.donovan@citrusbocc.com |
NOC Review
Approved
| Assigned to Reviewer: Gabe Donovan gabe.donovan@citrusbocc.com |
Contractor Change Review
Approved
| Assigned to Reviewer: Gabe Donovan gabe.donovan@citrusbocc.com |
Land Assessment Review
Complete
<div>Laurie Settle</div><div>Telephone (352) 527-5420</div><div>Laurie.settle@citrusbocc.gov</div>
Environmental Health Final Review
Approved
Contractor Change Review
Request for Information
| Assigned to Reviewer: Gabe Donovan gabe.donovan@citrusbocc.com |
08-28-2025PERMIT REVIEW COMMENT
Please see and complete change of contractor procedure (attached).
Contractor Change Review
Approved
| Assigned to Reviewer: Gabe Donovan gabe.donovan@citrusbocc.com |
Land Assessment Review
Complete
| Assigned to Reviewer: Laurie Settle | THIS IS A DUPLICATE REVIEW TO ONE COPLETED 8/19/25. LS <div><div>Laurie Settle</div><div>Telephone (352) 527-5420</div><div>Laurie.settle@citrusbocc.gov</div></div>
Environmental Health Final Review
Approved
Finalization Review
Request for Information
10-22-2025ADDITIONAL DOCUMENTS REQUIRED
Need health final. Emailed customer.
Finalization Review
Approved