Identification

Permit Number
BLD2024335882
Type
New SFD - New Sfd
Added On
09-05-2024 02:44 PM
Declared Value
$396,445.67


Status (Closed)

Expires On
11-26-2025
Issued On
10-30-2024
Final On
05-30-2025
Certified On
05-30-2025


Description of Work

New construction - SFR  **SITE PLAN APPROVED FOR SFD ONLY, 2 TREES TO BE RETAINED ON SITE** NOC FOR SFD OR BL 3499/PG 727**



Site Information

Primary Address
43 BELLS OF IRELAND CT HOMOSASSA, FL 34446
Other Linked
1820130020020400280 SUGARMILL WOODS, OAK VILLAGE
20
18
30
02040
0280


Contacts

Contacts

Licensed Contact Primary MCLENNAN CONSTRUCTION GROUP 965 PAPAYA LANE WINTER SPRINGS, FL 32708

Property Owner SMC FUTURE HOLDINGS LLC 204 E MILLER ST ORLANDO, FL 32806

Licensed Contact MECHANICAL ONE LLC 465 S ORLANDO AVENUE, UNIT 412 MAITLAND, FL 32751

Licensed Contact MECHANICAL ONE LLC 465 S ORLANDO AVENUE, UNIT 412 MAITLAND, FL 32751

Licensed Contact MECHANICAL ONE LLC 465 S ORLANDO AVENUE, UNIT 412 MAITLAND, FL 32751

Licensed Contact PROFORMANCE ROOFING 270 W PLANT ST #310, ORANGE COUNTY WINTER GARDEN, FL 34787



Progress

Reviews
Permit Specialist Review Missing Information

Additional Information

09-06-2024PERMIT REVIEW COMMENT
PLANS ARE MISSING DIGITAL SEAL

Permit Specialist Review Approved
| Assigned to Reviewer: Melissa Keene-Weis Melissa.KeeneWeis@citrusbocc.com |
Addressing Review Approved

Engineering FFEA Review Request for Information

Additional Information

09-30-2024Engineering Misc.
Pending resubmittal of revised waiver application.

Plans Examiner Review Request for Information

Additional Information

09-19-2024SEE PROBLEM DETAILS IN COMMENTS
Additional information required:<div><br></div><div>&nbsp;Multiple references on the Florida Product Approval form are expired, Provide Florida Product Approval form with current code or expiration references for review.</div>

Driveway Review Approved
Swale'd apron to allow for proper drainage from high to low side of entire property frontage within ROW. No current roadway damage.
Site Review Approved
SITE PLAN APPROVED FOR SFD ONLY, 2 TREES TO BE RETAINED ON SITE**
Utility Review Approved

Additional Information

09-23-2024DigEplan Review 09-23-2024
PERMITEE/OWNER MUST SUPPLY AND INSTALL A PRESSURE REGULATOR

09-23-2024DigEplan Review 09-23-2024
LOT MUST CONNECT TO CITRUS COUNTY’S CENTRAL SEWER SYSTEM.

09-23-2024DigEplan Review 09-23-2024
LOT MUST CONNECT TO CITRUS COUNTY’S CENTRAL WATER SYSTEM.

09-23-2024DigEplan Review 09-23-2024
SEWER CLEAN OUT MUST BE VISIBLE AND SET TO GRADE IN ORDER TO PASS FINAL INSPECTION.

Engineering Slab Waiver Review Request for Information
| Assigned to Reviewer: LORRIE L SCHWENNEKER lorrie.schwenneker@citrusbocc.com |
Additional Information

09-30-2024Engineering Misc.
No site plan submitted showing the location of the home, driveway, sidewalks, existing and proposed elevations as required.

Review Consolidation Request for Information
| Assigned to Reviewer: Melissa Keene-Weis Melissa.KeeneWeis@citrusbocc.com |
Review Distribution Approved
| Assigned to Reviewer: Melissa Keene-Weis Melissa.KeeneWeis@citrusbocc.com |
Engineering FFEA Review Approved
| Assigned to Reviewer: LORRIE L SCHWENNEKER lorrie.schwenneker@citrusbocc.com |
Plans Examiner Review Approved
| Assigned to Reviewer: Mark Hammer mark.hammer@citrusbocc.com |
Engineering Slab Waiver Review Conditional Approved
<p class="MsoNormal" style="text-indent:.25in"><b><span style="font-size:12.0pt;line-height:115%;font-family:&quot;Arial&quot;,sans-serif">WAIVER CONDITIONS OF APPROVAL<o:p></o:p></span></b></p> <p class="MsoNormal" style="text-indent:.25in"><span style="font-size:12.0pt; line-height:115%;font-family:&quot;Arial&quot;,sans-serif">&nbsp;&nbsp;&nbsp; </span><span style="font-size:12.0pt; line-height:115%"><o:p></o:p></span></p> <p class="MsoListParagraphCxSpFirst"><span style="font-size:12.0pt;line-height: 115%;font-family:&quot;Arial&quot;,sans-serif;text-transform:uppercase">1. LOT SHALL BE GRADED IN ACCORDANCE WITH THE LOT GRADING PLAN SUBMITTED WITH THIS WAIVER APPLICATION.<o:p></o:p></span></p> <p class="MsoListParagraphCxSpMiddle"><span style="font-size:12.0pt;line-height: 115%;font-family:&quot;Arial&quot;,sans-serif;text-transform:uppercase">&nbsp;</span></p> <p class="MsoListParagraphCxSpMiddle"><span style="font-size:12.0pt;line-height: 115%;font-family:&quot;Arial&quot;,sans-serif">2. PROVIDE ANY STORMWATER CONTROLS NECESSARY TO PREVENT FLOODING OF THE STRUCTURE.<o:p></o:p></span></p> <p class="MsoListParagraphCxSpMiddle"><span style="font-size:12.0pt;line-height: 115%;font-family:&quot;Arial&quot;,sans-serif">&nbsp;</span></p> <p class="MsoListParagraphCxSpLast"><span style="font-size:12.0pt;line-height: 115%;font-family:&quot;Arial&quot;,sans-serif">3. POST DEVELOPMENT RUNOFF TO ADJACENT PROPERTIES NOT TO EXCEED PRE-DEVELOPMENT RUNOFF.&nbsp; PROVIDE ANY STORMWATER CONTROLS NECESSARY.&nbsp;<o:p></o:p></span></p>
Review Consolidation Approved
| Assigned to Reviewer: Melissa Keene-Weis Melissa.KeeneWeis@citrusbocc.com |
Pre Permit Issuance Review Missing Information
| Assigned to Reviewer: Melissa Keene-Weis Melissa.KeeneWeis@citrusbocc.com |
Additional Information

10-14-2024PERMIT REVIEW COMMENT
NEED MECHANICAL, ELECTRICAL &amp; PLUMBING

Pre Permit Issuance Review Add Fees
| Assigned to Reviewer: Melissa Keene-Weis Melissa.KeeneWeis@citrusbocc.com |
Pre Permit Issuance Review Approved
| Assigned to Reviewer: Melissa Keene-Weis Melissa.KeeneWeis@citrusbocc.com |
NOC Review Approved
| Assigned to Reviewer: Melissa Keene-Weis Melissa.KeeneWeis@citrusbocc.com |
Land Assessment Review Complete

Finalization Review Approved

Blower Door Test Approved

Insulation Affidavit Approved


Conditions

Inspections
1st Rough Plumbing Inspection (#1)Scheduled For: 12-03-2024Is Assigned Passed on 12-03-2024
| Assigned to Inspector: Steven Chmura |
2nd Rough Plumbing Inspection (#1)Scheduled For: 01-24-2025Is Assigned Passed on 01-24-2025
| Assigned to Inspector: Joe Moss |
Dry-In Inspection (#1)Scheduled For: 01-17-2025Is Assigned Passed on 01-17-2025
| Assigned to Inspector: Joe Moss |
Engineering Erosion Control Inspection (#1) Waived on 10-30-2024
<p class="MsoNormal"><a name="_Hlk161386333">An </a><a name="_Hlk167280269">Erosion Control Inspection is generated for every permit where ground disturbance occurs. <o:p></o:p></a></p> <p class="MsoNormal"><b><span style="font-size:14.0pt">The Erosion Control Inspection should be the FIRST inspection for any permit. <o:p></o:p></span></b></p> <p class="MsoNormal">The Erosion Control inspection is to verify that erosion control measures are in place to prevent offsite sediment and stormwater runoff into Wetlands, Waterways or the County’s Stormwater Drainage System. <o:p></o:p></p> <p class="MsoNormal">Erosion control measures are required to be in place as soon as any ground disturbance begins and maintained throughout the construction process. Additional inspections may be added later if we receive a complaint and/or observe offsite impacts. <o:p></o:p></p> <p class="MsoNormal">Erosion control measures such as a vegetative buffer, silt fence, or any appropriate Best Management Practice, as described in the Florida Stormwater Erosion and Sedimentation Control Manual, may be used. The manual can be downloaded at <a href="https://www.fsesci.com/downloads/">https://www.fsesci.com/downloads/</a> <o:p></o:p></p> <p class="MsoNormal">A vegetative buffer is the most efficient and cost-effective form of erosion control. For most sites, a minimum of 15 ft of undisturbed vegetation is a sufficient buffer. Steep sites may require a larger buffer area. A vegetative buffer can be reestablished on a disturbed site with the installation of sod. <o:p></o:p></p> <p class="MsoNormal">Silt fence is the most commonly used form of erosion control protection. Silt fence needs to be placed so that it includes all areas of fill or disturbed soils, and the silt fence needs to be keyed into the ground (buried up to the line, you should be able to pull up on the silt fence at any point and it does not move at the ground). Additional BPMs may be needed for sites with steep slopes.<o:p></o:p></p>
Final Building Inspection (#1)Scheduled For: 04-22-2025Is Assigned Failed on 04-22-2025
| Assigned to Inspector: Joe Moss |
Violations

04-22-2025See Violation Details in Comments Transferred to Re-inspection04-22-2025
1. R704.2.1 soffit fastened at both ends. contractor stated at frame inspection they use an f channel that is attached to the soffit with screws; ilo nailer, no screws visible at final. 2. final termite treat not posted FBC105.11

Final Building Inspection (#2)Scheduled For: 05-27-2025Is Assigned Failed on 05-27-2025
| Assigned to Inspector: Joe Moss |
Violations

04-22-2025See Violation Details in Comments Transferred to Re-inspection05-27-2025
1. R704.2.1 soffit fastened at both ends. contractor stated at frame inspection they use an f channel that is attached to the soffit with screws; ilo nailer, no screws visible at final. 2. final termite treat not posted FBC105.11

05-27-2025See Violation Details in Comments Transferred to Re-inspection05-27-2025
Need clarification / correction. f channel is not fastened per product approvals onsite. product approvals call for 2 fasteners in the f channel ( one in leg and one in slot) 12" o.c. do not have slot fastener and leg fastener is not 12" o.c. 13"-18" in uncovered areas. called supplier as requested by contractor in previous email. supplier stated incorrect product approval was onsite. supplier sent new approvals. new approvals (3 tnails clustered every 24" o.c. )nailing does not match onsite install. please clarify what product you are using, have onsite for reinspection and correct as necessary. will need more areas open for inspection.

Final Building Inspection (#3)Scheduled For: 05-30-2025Is Assigned Passed on 05-30-2025
| Assigned to Inspector: Peter Giverc |
Violations

04-22-2025See Violation Details in Comments Complied05-30-2025
1. R704.2.1 soffit fastened at both ends. contractor stated at frame inspection they use an f channel that is attached to the soffit with screws; ilo nailer, no screws visible at final. 2. final termite treat not posted FBC105.11

05-27-2025See Violation Details in Comments Complied05-30-2025
Need clarification / correction. f channel is not fastened per product approvals onsite. product approvals call for 2 fasteners in the f channel ( one in leg and one in slot) 12" o.c. do not have slot fastener and leg fastener is not 12" o.c. 13"-18" in uncovered areas. called supplier as requested by contractor in previous email. supplier stated incorrect product approval was onsite. supplier sent new approvals. new approvals (3 tnails clustered every 24" o.c. )nailing does not match onsite install. please clarify what product you are using, have onsite for reinspection and correct as necessary. will need more areas open for inspection.

Final Driveway Apron Inspection (#1)Scheduled For: 04-21-2025Is Assigned Passed on 04-21-2025

Final Electric Inspection (#1)Scheduled For: 04-21-2025Is Assigned Failed on 04-21-2025
| Assigned to Inspector: Joe Moss |
Violations

04-21-2025See Violation Details in Comments Transferred to Re-inspection04-21-2025
Smoke detector fpa 29.11.3.4 missing smoke detector in bed 4. note: keep min 3' away from all vents.

Final Electric Inspection (#2)Scheduled For: 04-22-2025Is Assigned Passed on 04-22-2025
| Assigned to Inspector: Joe Moss |
Violations

04-21-2025See Violation Details in Comments Complied04-22-2025
Smoke detector fpa 29.11.3.4 missing smoke detector in bed 4. note: keep min 3' away from all vents.

Final Mechanical Inspection (#1)Scheduled For: 04-21-2025Is Assigned Passed on 04-21-2025
| Assigned to Inspector: Joe Moss |
Final Plumbing Inspection (#1)Scheduled For: 04-21-2025Is Assigned Passed on 04-21-2025
| Assigned to Inspector: Joe Moss |
Final Utilities Residential Inspection (#1)Scheduled For: 04-21-2025Is Assigned Passed on 04-22-2025
| Assigned to Inspector: TIMOTHY J HUDSON | Final passed
Frame Inspection (#1)Scheduled For: 01-24-2025Is Assigned Failed on 01-24-2025
| Assigned to Inspector: Joe Moss |
Violations

01-24-2025See Violation Details in Comments Transferred to Re-inspection01-24-2025
Not per plans r106.4 1. miss t brace a1a,a1b,a2a,a3a,b1a,c3. 2. fix straps marked in red. 3. need soffit nailer. 4. fix twist strap at living room post marked in red. 5. miss window bucs 6. a1b has a broken wed longer than 12" need eng letter on fix.

01-30-2025See Violation Details in Comments
correct and proceed, will check at insulation. 1. need engineers letter or broken web a1b. 2. fix strap left wall garage marked in red.

Frame Inspection (#2)Scheduled For: 01-30-2025Is Assigned Passed on 01-30-2025
| Assigned to Inspector: Joe Moss |
Violations

01-24-2025See Violation Details in Comments Complied01-30-2025
Not per plans r106.4 1. miss t brace a1a,a1b,a2a,a3a,b1a,c3. 2. fix straps marked in red. 3. need soffit nailer. 4. fix twist strap at living room post marked in red. 5. miss window bucs 6. a1b has a broken wed longer than 12" need eng letter on fix.

01-30-2025See Violation Details in Comments Complied01-30-2025
correct and proceed, will check at insulation. 1. need engineers letter or broken web a1b. 2. fix strap left wall garage marked in red.

Lintel Inspection (#1)Scheduled For: 12-18-2024Is Assigned Passed on 12-18-2024
| Assigned to Inspector: Joe Moss |
Pre Electric Pre Final Inspection (#1)Scheduled For: 04-02-2025Is Assigned Passed on 04-02-2025
| Assigned to Inspector: Elizabeth BrownMcWatters |
Pre Power Release (#1)Scheduled For: 04-02-2025Is Assigned Confirmed on 04-02-2025
BLD2024335882 Owner Name: SMC FUTURE HOLDINGS LLC Inspection Passed on: 4/2/2025
Final Power Release (#1)Scheduled For: 04-22-2025Is Assigned Confirmed on 04-22-2025
BLD2024335882 Owner Name: SMC FUTURE HOLDINGS LLC Inspection Passed on: 4/22/2025
Rough Electric Inspection (#1)Scheduled For: 01-24-2025Is Assigned Passed on 01-24-2025
| Assigned to Inspector: Joe Moss |
Rough Mechanical Inspection (#1)Scheduled For: 01-24-2025Is Assigned Passed on 01-24-2025
| Assigned to Inspector: Joe Moss |
Sheathing Inspection (#1)Scheduled For: 01-03-2025Is Assigned Passed on 01-03-2025
| Assigned to Inspector: Joe Moss |
Slab Inspection (#1)Scheduled For: 12-09-2024Is Assigned Passed on 12-09-2024
| Assigned to Inspector: Joe Moss |
Structural Frame Inspection (#1)Scheduled For: 01-24-2025Is Assigned Closed on 01-24-2025
| Assigned to Inspector: Joe Moss |
Violations

01-24-2025See Violation Details in Comments
str called with frame. see notes in frame

TUG Meter Inspection (#1)Scheduled For: 01-03-2025Is Assigned Passed on 01-03-2025
| Assigned to Inspector: Joe Moss |
TUG Meter Power Release (#1)Scheduled For: 01-03-2025Is Assigned Confirmed on 01-03-2025
BLD2024335882 Owner Name: SMC FUTURE HOLDINGS LLC Inspection Passed on: 1/3/2025
Wire Lath Inspection (#1)Scheduled For: 01-28-2025Is Assigned Canceled on 01-28-2025
| Assigned to Inspector: Joe Moss |
Violations

01-28-2025See Violation Details in Comments Transferred to Re-inspection01-28-2025
call wire lath after frame inspection

Wire Lath Inspection (#2) Passed on 01-30-2025

Violations

01-28-2025See Violation Details in Comments Complied01-30-2025
call wire lath after frame inspection

Final Roof Inspection (#1)Scheduled For: 04-21-2025Is Assigned Passed on 04-21-2025
| Assigned to Inspector: Joe Moss |
Insulation Inspection (#1)Scheduled For: 02-03-2025Is Assigned Failed on 02-03-2025
| Assigned to Inspector: Joe Moss |
Violations

02-03-2025See Violation Details in Comments Transferred to Re-inspection02-03-2025
previous truss repair not addressed.

Insulation Inspection (#2)Scheduled For: 02-04-2025Is Assigned Failed on 02-05-2025
| Assigned to Inspector: Joe Moss |
Violations

02-03-2025See Violation Details in Comments Transferred to Re-inspection02-05-2025
previous truss repair not addressed.

02-05-2025See Violation Details in Comments Transferred to Re-inspection02-05-2025
truss repair has not been done per truss eng drawing. missing top plywood patches. then will require tbracing on assembly

Insulation Inspection (#3)Scheduled For: 02-06-2025Is Assigned Passed on 02-05-2025
| Assigned to Inspector: Joe Moss |
Violations

02-03-2025See Violation Details in Comments Complied02-05-2025
previous truss repair not addressed.

02-05-2025See Violation Details in Comments Complied02-05-2025
truss repair has not been done per truss eng drawing. missing top plywood patches. then will require tbracing on assembly