PERMIT SEARCH PORTAL
Details

Identification

Permit Number
BLD2024333945
Type
Accessory - Accessory Structure
Added On
07-29-2024 08:24 PM
Declared Value
$30,000.00


Status (Issued)

Expires On
03-03-2025
Issued On
08-07-2024
Final On
Certified On


Description of Work

new 30x50 metal building on new slab with electric&nbsp; **NOC REQUIRED-IN OR BK:3488 PG:1475.**&nbsp;<span>FLOOD ZONE AE/X, STRUCTURE APPEARS TO BE LOCATED IN FLOOD ZONE X, FEMA REGULATIONS DO NOT APPLY**</span>*SITE APPROVED FOR 30 X 50 METAL BLDG ON NEW SLAB/W ELECTRIC ONLY*<p class="MsoNormal"></p>



Site Information

Primary Address
116 S SALISBURY TER LECANTO, FL 34461
Other Linked
1819010010000E00115 NEW MAYFIELD ACRES
19
19
06
000E0
0115


Contacts

Contacts

Property Owner Primary David Crum 189 w pearson st hernando, FL 34442

Property Owner CRUM DAVID H & TAMMY M 189 W PEARSON ST HERNANDO, FL 34442



Progress

Reviews
Permit Specialist Review Missing Information
DOCUMENTATION MISSING OWNER BUILDER AFFIDAVIT AND BUILDING PERMIT APPLICATION.&nbsp;
Additional Information

08-01-2024PERMIT REVIEW COMMENT
DOCUMENTATION MISSING OWNER BUILDER AFFIDAVIT AND BUILDING PERMIT APPLICATION.&nbsp;

Permit Specialist Review Approved
| Assigned to Reviewer: Taylor Schwing taylor.schwing@citrusbocc.com |
Flood Review Approved
<p class="MsoNormal">FLOOD ZONE AE/X, STRUCTURE APPEARS TO BE LOCATED IN FLOOD ZONE X, FEMA REGULATIONS DO NOT APPLY<o:p></o:p></p>
Plans Examiner Review Approved

Site Review Approved
*SITE APPROVED FOR 30 X 50 METAL BLDG ON NEW SLAB/W ELECTRIC ONLY*
Environmental Health Review Waived
| Assigned to Reviewer: Taylor Schwing taylor.schwing@citrusbocc.com |
Review Consolidation Approved
| Assigned to Reviewer: Taylor Schwing taylor.schwing@citrusbocc.com |
Pre Permit Issuance Review Add Fees
| Assigned to Reviewer: Taylor Schwing taylor.schwing@citrusbocc.com |
Pre Permit Issuance Review Approved
| Assigned to Reviewer: Taylor Schwing taylor.schwing@citrusbocc.com |
NOC Review Approved
| Assigned to Reviewer: Taylor Schwing taylor.schwing@citrusbocc.com |

Conditions

Inspections
Engineering Erosion Control Inspection (#1) Waived on 08-19-2024
<p class="MsoNormal">We have waived this inspection so you may continue forward on your project. <br> <b>Please be sure to have erosion control measures in place throughout the construction process to prevent offsite sediment and stormwater runoff.</b> <br> Based on our review<a name="_Hlk151035484">, it doesn’t appear that construction activity would affect any Wetlands, Waterways, and/or the County’s Stormwater Drainage System. <br> An inspection may be added later if we receive a complaint and/or observe offsite impacts. </a><o:p></o:p></p> <p class="MsoNormal"><o:p>&nbsp;</o:p></p> <p class="MsoNormal"><a name="_Hlk151035337">Erosion control measures are required to be in place as soon as any ground disturbance begins and maintained throughout the construction process. <o:p></o:p></a></p> <p class="MsoNormal">Erosion control measures such as a vegetative buffer, silt fence, or any appropriate Best Management Practice, as described in the Florida Stormwater Erosion and Sedimentation Control Manual, may be used. The manual can be downloaded at <a href="https://www.fsesci.com/downloads/">https://www.fsesci.com/downloads/</a> <o:p></o:p></p> <p class="MsoNormal">A vegetative buffer is the most efficient and cost-effective form of erosion control. For most sites, a minimum of 15 ft of undisturbed vegetation is a sufficient buffer. Steep sites may require a larger buffer area. A vegetative buffer can be reestablished on a disturbed site with the installation of sod. Silt fence is the most commonly used form of erosion control protection. Silt fence needs to be placed so that it includes all areas of fill or disturbed soils, and the silt fence needs to be keyed into the ground (buried up to the line, you should be able to pull up on the silt fence at any point and it does not move at the ground). Additional BPMs may be needed for sites with steep slopes.<o:p></o:p></p>
Rough Electric Inspection (#1)

Slab Inspection (#1)Scheduled For: 09-04-2024Is Assigned Passed on 09-04-2024
| Assigned to Inspector: VINCENT MCCRAVE |