1st Rough Plumbing Inspection (#1)Scheduled For: 06-21-2024Is Assigned
Passed on 06-21-2024
| Assigned to Inspector: Steven Chmura |
2nd Rough Plumbing Inspection (#1)Scheduled For: 08-08-2024Is Assigned
Passed on 08-08-2024
| Assigned to Inspector: Steven Chmura |
Dry-In Inspection (#1)Scheduled For: 08-02-2024Is Assigned
Passed on 08-02-2024
| Assigned to Inspector: DAVID CRUM |
Engineering Erosion Control Inspection (#1)
Waived on 06-20-2024
<p class="MsoNormal"><a name="_Hlk159590737"></a><a name="_Hlk159304001"></a><a name="_Hlk156544648"></a><a name="_Hlk156564901"></a>We have waived this inspection so you may continue forward on
your project. <br>
<b>Please be sure to have erosion control measures in place throughout the
construction process to prevent offsite sediment and stormwater runoff.</b> <br>
Based on our review<a name="_Hlk151035484">, it doesn’t appear that
construction activity would affect any Wetlands, Waterways, and/or the County’s
Stormwater Drainage System. <br>
</a>An inspection may be added
later if we receive a complaint and/or observe offsite impacts. <o:p></o:p></p>
<p class="MsoNormal"><o:p> </o:p></p>
<p class="MsoNormal"><a name="_Hlk151035337">Erosion control measures are required to be in place as
soon as any ground disturbance begins and maintained throughout the
construction process. <o:p></o:p></a></p>
<p class="MsoNormal">Erosion control measures such as a
vegetative buffer, silt fence, or any appropriate Best Management Practice, as
described in the Florida Stormwater Erosion and Sedimentation Control Manual,
may be used. The manual can be downloaded at <a href="https://www.fsesci.com/downloads/">https://www.fsesci.com/downloads/</a> <o:p></o:p></p>
<p class="MsoNormal">A vegetative buffer is the most efficient
and cost-effective form of erosion control. For most sites, a minimum of 15 ft
of undisturbed vegetation is a sufficient buffer. Steep sites may require a
larger buffer area. A vegetative buffer can be reestablished on a disturbed
site with the installation of sod. Silt fence is the most commonly used form of
erosion control protection. Silt fence needs to be placed so that it includes
all areas of fill or disturbed soils, and the silt fence needs to be keyed into
the ground (buried up to the line, you should be able to pull up on the silt
fence at any point and it does not move at the ground). Additional BPMs may be
needed for sites with steep slopes.<o:p></o:p></p>
Final Building Inspection (#1)Scheduled For: 10-30-2024Is Assigned
Canceled on 10-30-2024
| Assigned to Inspector: VINCENT G ARTESE |
10-30-2024See Violation Details in Comments
Transferred to Re-inspection10-30-2024
See final electric
Final Building Inspection (#2)Scheduled For: 10-31-2024Is Assigned
Passed on 10-31-2024
| Assigned to Inspector: Scott McGroarty |
10-30-2024See Violation Details in Comments
Complied10-31-2024
See final electric
Final Driveway Apron Inspection (#1)Scheduled For: 10-30-2024Is Assigned
Passed on 10-30-2024
Final Electric Inspection (#1)Scheduled For: 10-30-2024Is Assigned
Failed on 10-30-2024
| Assigned to Inspector: Jeremy Lentz |
10-30-2024See Violation Details in Comments
Transferred to Re-inspection10-30-2024
1. CONDENSING UNIT IS RATED FOR MAX 25AMP BREAKER. 30AMP INSTALLED
2. SMOKE/CARBON MONOXIDE DETECTOR REQUIRED OUTSIDE OF BEDROOMS.
Final Electric Inspection (#2)Scheduled For: 10-31-2024Is Assigned
Passed on 10-31-2024
| Assigned to Inspector: Scott McGroarty |
10-30-2024See Violation Details in Comments
Complied10-31-2024
1. CONDENSING UNIT IS RATED FOR MAX 25AMP BREAKER. 30AMP INSTALLED
2. SMOKE/CARBON MONOXIDE DETECTOR REQUIRED OUTSIDE OF BEDROOMS.
Final Mechanical Inspection (#1)Scheduled For: 10-30-2024Is Assigned
Canceled on 10-30-2024
| Assigned to Inspector: VINCENT G ARTESE |
10-30-2024See Violation Details in Comments
Transferred to Re-inspection10-30-2024
See violation on breaker size on AC unit
Final Mechanical Inspection (#2)Scheduled For: 10-31-2024Is Assigned
Passed on 10-31-2024
| Assigned to Inspector: Scott McGroarty |
10-30-2024See Violation Details in Comments
Complied10-31-2024
See violation on breaker size on AC unit
Final Plumbing Inspection (#1)Scheduled For: 10-30-2024Is Assigned
Failed on 10-30-2024
| Assigned to Inspector: VINCENT G ARTESE |
10-30-2024See Violation Details in Comments
Transferred to Re-inspection10-30-2024
Toilet bases need to be sealed
Final Plumbing Inspection (#2)Scheduled For: 10-31-2024Is Assigned
Passed on 10-31-2024
| Assigned to Inspector: Scott McGroarty |
10-30-2024See Violation Details in Comments
Complied10-31-2024
Toilet bases need to be sealed
Final Utilities Residential Inspection (#1)Scheduled For: 10-30-2024Is Assigned
Passed on 10-30-2024
| Assigned to Inspector: TIMOTHY J HUDSON | Final passed
Frame Inspection (#1)Scheduled For: 07-26-2024Is Assigned
Canceled on 07-26-2024
| Assigned to Inspector: DAVID CRUM |
07-26-2024See Violation Details in Comments
Transferred to Re-inspection07-26-2024
meant to schedule str frame.check str frame notes
Frame Inspection (#2)Scheduled For: 08-14-2024Is Assigned
Failed on 08-14-2024
| Assigned to Inspector: DAVID CRUM |
07-26-2024See Violation Details in Comments
Transferred to Re-inspection08-14-2024
sliding glass door not sealed per fbcr703.4
garage door not installed.
Frame Inspection (#3)Scheduled For: 08-16-2024Is Assigned
Passed on 08-16-2024
| Assigned to Inspector: DAVID CRUM |
07-26-2024See Violation Details in Comments
Complied08-16-2024
sliding glass door not sealed per fbcr703.4
garage door not installed.
Lintel Inspection (#1)Scheduled For: 07-09-2024Is Assigned
Passed on 07-09-2024
| Assigned to Inspector: DAVID CRUM |
Pre Electric Pre Final Inspection (#1)
Closed on 11-01-2024
Jamie sent email on 11/1/24 @ 10:18am<div><br></div><p class="MsoNormal">Hello,
<o:p></o:p></p><p class="MsoNormal"><o:p> </o:p></p><p class="MsoNormal">Can
you please remove the pre-final electric inspection on permit
BLD202404155?<o:p></o:p></p><p class="MsoNormal"><o:p> </o:p></p><p>
</p><p class="MsoNormal">Thank
you<br clear="all">
<o:p></o:p></p>
Final Power Release (#1)Scheduled For: 10-31-2024Is Assigned
Confirmed on 10-31-2024
BLD202404155 Owner Name: EMPIRE CONSTRUCTION MANAGEMENT LLC Inspection Passed on: 10/31/2024
Rough Electric Inspection (#1)Scheduled For: 08-08-2024Is Assigned
Passed on 08-08-2024
| Assigned to Inspector: Philip Charnock |
Rough Mechanical Inspection (#1)Scheduled For: 08-08-2024Is Assigned
Passed on 08-08-2024
| Assigned to Inspector: Philip Charnock |
Sheathing Inspection (#1)Scheduled For: 07-26-2024Is Assigned
Passed on 07-26-2024
| Assigned to Inspector: DAVID CRUM |
Slab Inspection (#1)Scheduled For: 06-25-2024Is Assigned
Passed on 06-25-2024
| Assigned to Inspector: VINCENT G ARTESE |
Structural Frame Inspection (#1)
Passed on 07-26-2024
07-26-2024See Violation Details in Comments
Complied07-26-2024
nail A01 two rows 9" o.c.
fix sheathing in valley by front door. walked with framer on site. will check at frame.
TUG Meter Inspection (#1)Scheduled For: 08-08-2024Is Assigned
Passed on 08-08-2024
| Assigned to Inspector: Philip Charnock |
TUG Meter Power Release (#1)Scheduled For: 08-08-2024Is Assigned
Confirmed on 08-08-2024
BLD202404155 Owner Name: EMPIRE CONSTRUCTION MANAGEMENT LLC Inspection Passed on: 8/8/2024
Final Roof Inspection (#1)Scheduled For: 10-30-2024Is Assigned
Passed on 10-30-2024
| Assigned to Inspector: VINCENT G ARTESE |
Insulation Inspection (#1)Scheduled For: 08-16-2024Is Assigned
Passed on 08-16-2024
| Assigned to Inspector: DAVID CRUM |