1st Rough Plumbing Inspection (#1)Scheduled For: 01-29-2024Is Assigned
Passed on 01-29-2024
| Assigned to Inspector: Private Provider Universal Engineering Sciences - Timothy Henline BN7069 |
1st Rough Plumbing Inspection (#1)Scheduled For: 01-29-2024
Private Provider Approved on 01-29-2024
PLUMBING UNDERGROUND T HENLINE MAIN BUILDING
1st Rough Plumbing Inspection (#2)Scheduled For: 03-27-2024
Private Provider Approved on 03-27-2024
T HENLINE PLUMBING SECOND ROUGH TOP OUT
1st Rough Plumbing Inspection (#3)Scheduled For: 05-29-2024
Private Provider Approved on 05-29-2024
T HENLINE EXTERIOR UNDERGROUND PIPING INSPECTION
1st Rough Plumbing Inspection (#4)Scheduled For: 08-29-2024
Private Provider Approved on 08-29-2024
T HENLINE MAIN WATER TIE IN TO BUILDING MAIN SEWER CONNECTION TO BUILDING
2nd Rough Plumbing Inspection (#1)Scheduled For: 03-27-2024Is Assigned
Passed on 03-27-2024
| Assigned to Inspector: Private Provider - Universal Engineering Sciences, LLC - Timothy Henline BN7069 |
Courtesy Inspection (#1)Scheduled For: 02-05-2024Is Assigned
Passed on 02-07-2024
PARTIAL TIE BEAM | Assigned to Inspector: Private Provider Universal Engineering Sciences - Robert W. Mason BN4490 |
Engineering Erosion Control Inspection (#1)
Failed on 05-01-2024
<p class="MsoNormal">An Erosion Control Inspection is generated for every permit
where ground disturbance occurs. <o:p></o:p></p>
<p class="MsoNormal"><b>The Erosion Control Inspection should be the FIRST
inspection for any permit. <o:p></o:p></b></p>
<p class="MsoNormal">The Erosion Control inspection is to verify that erosion
control measures are in place to prevent offsite sediment and stormwater
runoff. <o:p></o:p></p>
<p class="MsoNormal">Erosion control measures are required to be in place as soon
as any ground disturbance begins and maintained throughout the construction
process. Additional inspections may be added later if we receive a complaint
and/or observe offsite impacts. <o:p></o:p></p>
<p class="MsoNormal">Erosion control measures such as a vegetative buffer, silt
fence, or any appropriate Best Management Practice, as described in the Florida
Stormwater Erosion and Sedimentation Control Manual, may be used. The manual
can be downloaded at <a href="https://www.fsesci.com/downloads/">https://www.fsesci.com/downloads/</a>
<o:p></o:p></p>
<p class="MsoNormal">A vegetative buffer is the most efficient and cost-effective
form of erosion control. For most sites, a minimum of 15 ft of undisturbed
vegetation is a sufficient buffer. Steep sites may require a larger buffer
area. A vegetative buffer can be reestablished on a disturbed site with the
installation of sod. <o:p></o:p></p>
<p class="MsoNormal">Silt fence is the most commonly used form of erosion control
protection. Silt fence needs to be placed so that it includes all areas of fill
or disturbed soils, and the silt fence needs to be keyed into the ground
(buried up to the line, you should be able to pull up on the silt fence at any
point and it does not move at the ground). Additional BPMs may be needed for
sites with steep slopes.<o:p></o:p></p>
<p class="MsoNormal"><o:p> </o:p></p>
05-03-2024Failed Erosion Protection Controls
Transferred to Re-inspection05-01-2024
Please see email sent to permitting@baytobayproperties.com PDF copy in attachments
Final Building Inspection (#1)Scheduled For: 11-08-2024
Private Provider Approved on 11-08-2024
G DIXON
Footing Inspection (#1)Scheduled For: 01-19-2024Is Assigned
Passed on 01-19-2024
| Assigned to Inspector: Private Provider Universal Engineering Sciences - Debbie L. Board, BN5236 |
Footing Inspection (#1)Scheduled For: 02-26-2024Is Assigned
Passed on 02-26-2024
| Assigned to Inspector: Private Provider - Universal Engineering Sciences, LLC - Ross L. Howsare BN6929 |
Frame Inspection (#1)Scheduled For: 04-04-2024Is Assigned
Partial Passed on 04-04-2024
| Assigned to Inspector: Private Provider - Universal Engineering Sciences, LLC - Jeffrey B Ferrante BN7482 - Partial inspection area where coolers are to be installed |
Frame Inspection (#2)
Passed on 04-22-2024
Frame Inspection (#1)
Private Provider Approved on 05-20-2024
R HOWSARE FRAMING ABOVE COOLER
Frame Inspection (#2)
Private Provider Approved on 05-01-2024
J FERRANTE
Frame Inspection (#3)
Private Provider Approved on 04-18-2024
J FERRANTE
Frame Inspection (#4)Scheduled For: 04-16-2024
Private Provider Approved on 04-16-2024
J FERRANTE
Frame Inspection (#5)Scheduled For: 05-29-2024
Private Provider Approved on 05-29-2024
J FERRANTE***INTERIOR HARD CEILING INSPCTION 5/29/2024 CAN LIGHT ATTACHMENT IN HARD CEILING
Lintel Inspection (#1)Scheduled For: 02-20-2024Is Assigned
Passed on 02-20-2024
2nd Lift CMU @ bond beam EL 21' - 4' | Assigned to Inspector: Private Provider Universal Engineering Sciences - Robert W. Mason BN4490 |
Final NRS Engineering Inspection (#1)Is Assigned
Passed on 11-13-2024
| Assigned to Inspector: WILLIAM A LAFLAMME (JR) |
Final NRS Fire Inspection (#1)Is Assigned
Passed on 11-12-2024
| Assigned to Inspector: Mike Simek |
Final NRS Planning Inspection (#1)Is Assigned
Partial Passed on 11-13-2024
| Assigned to Inspector: MELISSA MORRIS |<div><br></div><div>Loading zone is not striped or marked. Please rectify within 30 days. </div>
Final NRS Utility Inspection (#1)Scheduled For: 09-09-2024Is Assigned
Passed on 09-09-2024
| Assigned to Inspector: TIMOTHY J HUDSON | Final passed
Pre Electric Pre Final Inspection (#1)Scheduled For: 08-19-2024
Passed on 08-26-2024
JEREMY PRITCHARD
Final Power Release (#1)Scheduled For: 11-08-2024Is Assigned
Confirmed on 11-08-2024
BLD202324310 Owner Name: 7-Eleven Lecanto
Rough Electric Inspection (#1)Scheduled For: 04-29-2024Is Assigned
Partial Passed on 04-03-2024PARTIAL
| Assigned to Inspector: Private Provider - Universal Engineering Sciences, LLC |
Rough Electric Inspection (#2)Scheduled For: 04-01-2024
Private Provider Approved on 04-01-2024
D SIROIS ELECTRICAL WALL ROUGH PARTIAL CONDUIT ONLY AS HIGHLIGHTED ON PLAN PAGE E1.01
Rough Electric Inspection (#3)Scheduled For: 04-15-2024
Private Provider Approved on 04-15-2024
G VIGRASS PARTIAL PASS AS NOTED ELECTRICAL ROUGH CONDUIT WALLS WILL NEED TO SCHEDULE ROUGH ELECTRIC TO INSPECT BOXES AFTER WIRE INSTALLED AND MADE UP
Rough Electric Inspection (#3)Scheduled For: 09-13-2024
Private Provider Approved on 09-13-2024
M ZUNIGA CEILING ONLY
Rough Mechanical Inspection (#1)Scheduled For: 05-20-2024
Private Provider Approved on 05-20-2024
T HENLINE ABOVE CEILING METAL DUCTING
Sheathing Inspection (#1)Scheduled For: 04-23-2024
Passed on 10-29-2024
Passed per uploaded document in attachment from Private provider (UES - Work order no. 7064714)
Sheathing Inspection (#1)Scheduled For: 04-22-2024
Private Provider Approved on 04-22-2024
WALL SHEATHING BY J FERRANTE
Sheathing Inspection (#1)Scheduled For: 04-23-2024
Private Provider Approved on 04-23-2024
ROOF SHEATHING J FERRANTE
Slab Inspection (#1)Scheduled For: 02-07-2024Is Assigned
Passed on 02-07-2024
| Assigned to Inspector: Private Provider Universal Engineering Sciences - Ross L. Howsare BN6929 |
Bond Beam/Stemwall Inspection (#1)Scheduled For: 03-08-2024Is Assigned
Passed on 03-08-2024
| Assigned to Inspector: Private Provider - Universal Engineering Sciences, LLC - George W Dixon BN1008 |
Bond Beam/Stemwall Inspection (#1)Scheduled For: 01-25-2024
Passed on 01-25-2024
R.MASON
Bond Beam/Stemwall Inspection (#1)Scheduled For: 03-08-2024
Passed on 03-08-2024
Structural Frame Inspection (#2)
Private Provider Approved on 02-05-2024
R MASON
Structural Frame Inspection (#3)Scheduled For: 02-20-2024
Private Provider Approved on 02-20-2024
TIE BEAM R MASON
Wire Lath Inspection (#1)Scheduled For: 06-18-2024Is Assigned
Private Provider Approved on 06-18-2024
| Assigned to Inspector: Private Provider - Universal Engineering Sciences, LLC - Ross L Howsare BN6929 |
Wire Lath Inspection (#1)Scheduled For: 06-18-2024
Private Provider Approved on 06-18-2024
R HOWSARE LATH INSPECTION
Final Plumbing Inspection (#1)
Private Provider Approved on 11-04-2024
JAMES FRASHER BN8525 PLUMBING FINAL
Final Mechanical Inspection (#1)
Private Provider Approved on 11-04-2024
JAMES T FRASHER BN8525
Final Mechanical Inspection (#2)Scheduled For: 11-01-2024
Private Provider Approved on 11-01-2024
J FRASHER
Final Electric Inspection (#1)Scheduled For: 11-08-2024
Private Provider Approved on 11-08-2024
N JONES
Underground Electric Inspection (#1)Scheduled For: 01-19-2024Is Assigned
Passed on 01-19-2024
| Assigned to Inspector: Private Provider Universal Engineering Sciences - Nathaniel R. Jones, BN6757 |
Underground Electric Inspection (#1)Scheduled For: 02-01-2024Is Assigned
Passed on 02-01-2024
| Assigned to Inspector: Private Provider Universal Engineering Sciences - Nathaniel R Jones BN6757 | PARTIAL PASS
Underground Electric Inspection (#1)Scheduled For: 01-19-2024
Private Provider Approved on 01-19-2024
N JONES UFFER GROUND INSPECTION
Underground Electric Inspection (#2)Scheduled For: 05-16-2024
Private Provider Approved on 05-16-2024
N JONES UNDERGROUND ELECTRIC PIPING SECONDARIES TO TRANSFORMER SEE SHEET C-501
Underground Electric Inspection (#3)Scheduled For: 02-01-2024
Private Provider Approved on 02-01-2024
N JONES RIGID CONDUITS THAT ARE FOR THE FUEL ISLAND OR OTHER RELATED AREAS ONLY
Insulation Inspection (#1)Scheduled For: 05-08-2024
Passed on 05-07-2024
Insulation Inspection (#2)Scheduled For: 05-03-2024
Private Provider Approved on 05-03-2024
INTERIOR INSULATION JEFFREY FERRANTE