PERMIT SEARCH PORTAL
Details

Identification

Permit Number
BLD202319621
Type
New SFD - New Sfd
Added On
07-04-2023 08:35 AM
Declared Value
$300,000.00


Status (Issued)

Expires On
03-15-2025
Issued On
09-21-2023
Final On
Certified On


Description of Work

NEW CONSTRUCTION OF 5133 SQ FT SFD    **NOC TO BUILD SINGLE FAMILY DWELLING RECORDED IN OR BK:3405/PG:1418**    **SITE APPROVED FOR SFD ONLY-MINIMUM OF 5 TREES TO REMAIN ON SITE** 



Site Information

Primary Address
64 W KELLER ST HERNANDO, FL 34442
Other Linked
1918180110003500330 CITRUS HILLS 1ST ADD (PB9-73)
18
18
25
00350
0330


Contacts

Contacts

Property Owner Primary Marissa and Parker Canario and Maddox 4256 E. Amsterdam Street Inverness, FL 34453



Related

Building Permits

Child BLD202319621-01 Amendment 04-04-2024 Issued



Progress

Reviews
Environmental Health Review Approved

Permit Specialist Review Missing Information

Additional Information

07-19-2023PERMIT REVIEW COMMENT
Please upload permit application and owner builder affidavit. These forms are required to be signed & notarized at the Citrus County Building Department as required by Florida Statute.

Permit Specialist Review Approved

Addressing Review Approved

Engineering FFEA Review Approved

Plans Examiner Review Approved

Driveway Review Approved
Swaled apron to follow existing grade.
Site Review Approved
**SITE APPROVED FOR SFD ONLY-MINIMUM OF 5 TREES TO REMAIN ON SITE 
Utility Review Approved
<p class="MsoNormal">Well and Septic.&nbsp;&nbsp; If future central water and/or sewer becomes available lot will be required to connect within 365 days of notification.&nbsp;&nbsp;<o:p></o:p></p>
Additional Information

09-13-2023DigEplan Review 09-13-2023
Central water is not available. Owner will need to install a well.

09-13-2023DigEplan Review 09-13-2023
Central water is not available. Owner will need to install a well.

Review Consolidation Approved

Pre Permit Issuance Review Add Fees

Pre Permit Issuance Review Approved

NOC Review Approved
*NOC TO BUILD SINGLE FAMILY DWELLING RECORDED IN OR BK:3405/PG:1418*
Environmental Health Final Review

Land Assessment Review Complete


Conditions

Inspections
1st Rough Plumbing Inspection (#1)Scheduled For: 11-01-2023Is Assigned Failed on 11-01-2023
| Assigned to Inspector: Steven Chmura |
Violations

11-01-2023See Violation Details in Comments Transferred to Re-inspection11-01-2023
must have county approved plans on jobsite,with county stamp of approval on each page

1st Rough Plumbing Inspection (#2)Scheduled For: 11-02-2023Is Assigned Passed on 11-02-2023
| Assigned to Inspector: Steven Chmura |
Violations

11-01-2023See Violation Details in Comments Complied11-02-2023
must have county approved plans on jobsite,with county stamp of approval on each page

2nd Rough Plumbing Inspection (#1)Scheduled For: 04-18-2024Is Assigned Passed on 04-18-2024
| Assigned to Inspector: Steven Chmura |
Dry-In Inspection (#1)Scheduled For: 04-22-2024Is Assigned Passed on 04-22-2024
| Assigned to Inspector: Andrew J Mylrea |
Violations

04-22-2024See Violation Details in Comments Complied04-22-2024
Doc box destroyed. Re-post permit and NOC.

Underground Electric Inspection (#1) Waived on 11-13-2023

Engineering Erosion Control Inspection (#1) Waived on 10-24-2023
<p class="MsoNormal">We have waived this inspection so you may continue forward on your project. <br> <b>Please be sure to have erosion control measures in place throughout the construction process to prevent offsite sediment and stormwater runoff.</b> <br> Based on our review, it doesn’t appear that construction activity would affect any wetlands/waterways, and/or our stormwater drainage system. <br> An inspection may be added later if we receive a complaint and/or observe offsite impacts. <o:p></o:p></p> <p class="MsoNormal"><o:p>&nbsp;</o:p></p> <p class="MsoNormal">Erosion control measures are required to be in place as soon as any ground disturbance begins and maintained throughout the construction process Additional inspections may be added later if we receive a complaint and/or observe offsite impacts. <o:p></o:p></p> <p class="MsoNormal">Erosion control measures such as a vegetative buffer, silt fence, or any appropriate Best Management Practice, as described in the Florida Stormwater Erosion and Sedimentation Control Manual, may be used. The manual can be downloaded at <a href="https://www.fsesci.com/downloads/">https://www.fsesci.com/downloads/</a> <o:p></o:p></p> <p class="MsoNormal">A vegetative buffer is the most efficient and cost-effective form of erosion control. For most sites, a minimum of 15 ft of undisturbed vegetation is a sufficient buffer. Steep sites may require a larger buffer area. A vegetative buffer can be reestablished on a disturbed site with the installation of sod. Silt fence is the most commonly used form of erosion control protection. Silt fence needs to be placed so that it includes all areas of fill or disturbed soils, and the silt fence needs to be keyed into the ground (buried up to the line, you should be able to pull up on the silt fence at any point and it does not move at the ground). Additional BPMs may be needed for sites with steep slopes.<o:p></o:p></p>
Final Building Inspection (#1)

Final Driveway Apron Inspection (#1)

Final Electric Inspection (#1)

Final Gas Inspection (#1)

Final Mechanical Inspection (#1)

Final Plumbing Inspection (#1)

Frame Inspection (#1)Scheduled For: 06-06-2024Is Assigned Failed on 06-06-2024
| Assigned to Inspector: VINCENT MCCRAVE |
Violations

06-06-2024See Violation Details in Comments Transferred to Re-inspection06-06-2024
DUCT BLOCKS ACCESS TO ATTIC FROM THE ATTIC ACCESS OPENING ON 2ND FLOOR, PLEASE CHOOSE A NEW LOCATION. FIREBLOCKING REQ. AT DROP CEILING IN KITCHEN WHERE DROP CEILING MEETS FURRED EXT. WALL. FIREBLOCKING REQ IN UTILITY WHERE SOFFIT IS LOCATED.

06-13-2024See Violation Details in Comments
Fire blocking not done cited by previous inspector.

Frame Inspection (#2)Scheduled For: 06-13-2024Is Assigned Failed on 06-13-2024
| Assigned to Inspector: VINCENT G ARTESE |
Violations

06-06-2024See Violation Details in Comments Transferred to Re-inspection06-13-2024
DUCT BLOCKS ACCESS TO ATTIC FROM THE ATTIC ACCESS OPENING ON 2ND FLOOR, PLEASE CHOOSE A NEW LOCATION. FIREBLOCKING REQ. AT DROP CEILING IN KITCHEN WHERE DROP CEILING MEETS FURRED EXT. WALL. FIREBLOCKING REQ IN UTILITY WHERE SOFFIT IS LOCATED.

Frame Inspection (#3) Passed on 06-25-2024

Violations

06-06-2024See Violation Details in Comments Complied06-25-2024
DUCT BLOCKS ACCESS TO ATTIC FROM THE ATTIC ACCESS OPENING ON 2ND FLOOR, PLEASE CHOOSE A NEW LOCATION. FIREBLOCKING REQ. AT DROP CEILING IN KITCHEN WHERE DROP CEILING MEETS FURRED EXT. WALL. FIREBLOCKING REQ IN UTILITY WHERE SOFFIT IS LOCATED.

Lintel Inspection (#1)Scheduled For: 11-30-2023Is Assigned Passed on 11-30-2023
| Assigned to Inspector: DAVID CRUM |
Rough Electric Inspection (#1)Scheduled For: 06-03-2024Is Assigned Passed on 06-03-2024
| Assigned to Inspector: Jeremy Lentz |
Rough Gas Inspection (#1)Scheduled For: 04-18-2024Is Assigned Passed on 04-18-2024
| Assigned to Inspector: Steven Chmura |
Rough Mechanical Inspection (#1)Scheduled For: 04-19-2024Is Assigned Passed on 04-19-2024
| Assigned to Inspector: JOHN S NASUTA |
Sheathing Inspection (#1)Scheduled For: 02-06-2024Is Assigned Passed on 02-06-2024
| Assigned to Inspector: VINCENT MCCRAVE |
Slab Inspection (#1)Scheduled For: 11-13-2023Is Assigned Passed on 11-13-2023
| Assigned to Inspector: SCOTT A SCHNETTLER |
Structural Frame Inspection (#1)Scheduled For: 02-29-2024Is Assigned Failed on 02-29-2024
| Assigned to Inspector: VINCENT MCCRAVE |
Violations

02-29-2024See Violation Details in Comments Transferred to Re-inspection02-29-2024
2X4 door bucks req tapcons. Detail C/S2 2 rows of blocking req. for int. bearing walls over 8' 6". See notes on Floorplan for placement of HTT4, HTT5, LTTP2 ON ALL STUD PACKS, OPENS AND CORNERS for both floors. Engineered floor truss bracing (strongbacks) are required to be the same species lumber or better than the truss. Truss F16 2x6 strongback in wrong location. Threaded rod (go bolt system) is not according to plan, no changes can be made with out engineer approval as stated in plan notes. please anchor the 2nd floor walls according to plan details. Truss Girders A7 & A8, 5ply & 4ply require additional structural screws at the junction points on both top and bottom chord. A7 requires screws both sides, see truss eng. detail for screw sizes.

Structural Frame Inspection (#2)Scheduled For: 04-16-2024Is Assigned Passed on 04-16-2024
| Assigned to Inspector: VINCENT MCCRAVE |
Violations

02-29-2024See Violation Details in Comments Complied04-16-2024
2X4 door bucks req tapcons. Detail C/S2 2 rows of blocking req. for int. bearing walls over 8' 6". See notes on Floorplan for placement of HTT4, HTT5, LTTP2 ON ALL STUD PACKS, OPENS AND CORNERS for both floors. Engineered floor truss bracing (strongbacks) are required to be the same species lumber or better than the truss. Truss F16 2x6 strongback in wrong location. Threaded rod (go bolt system) is not according to plan, no changes can be made with out engineer approval as stated in plan notes. please anchor the 2nd floor walls according to plan details. Truss Girders A7 & A8, 5ply & 4ply require additional structural screws at the junction points on both top and bottom chord. A7 requires screws both sides, see truss eng. detail for screw sizes.

T-Pole Inspection (#1)Scheduled For: 12-21-2023Is Assigned Passed on 12-21-2023
| Assigned to Inspector: JOHN S NASUTA |
T-Pole Power Release (#1)Scheduled For: 12-21-2023Is Assigned Confirmed on 12-21-2023
BLD202319621 Owner Name: CANARIO MARISSA Inspection Passed on: 12/21/2023
Wire Lath Inspection (#1)Scheduled For: 06-25-2024Is Assigned Passed on 06-25-2024

Final Roof Inspection (#1)Scheduled For: 08-12-2024Is Assigned Canceled on 08-12-2024
| Assigned to Inspector: VINCENT MCCRAVE |
Violations

08-12-2024See Violation Details in Comments Transferred to Re-inspection08-12-2024
According to plans, sheet 4, an off ridge vent is included in the calculations. please verify with engineer if it is required or only a recommendation.

Final Roof Inspection (#2)Scheduled For: 08-20-2024Is Assigned Canceled on 08-20-2024
| Assigned to Inspector: VINCENT MCCRAVE |
Violations

08-12-2024See Violation Details in Comments Transferred to Re-inspection08-20-2024
According to plans, sheet 4, an off ridge vent is included in the calculations. please verify with engineer if it is required or only a recommendation.

Final Roof Inspection (#3)Scheduled For: 09-13-2024Is Assigned Passed on 09-16-2024
| Assigned to Inspector: VINCENT MCCRAVE |
Violations

08-12-2024See Violation Details in Comments Complied09-16-2024
According to plans, sheet 4, an off ridge vent is included in the calculations. please verify with engineer if it is required or only a recommendation.

Insulation Inspection (#1)Scheduled For: 08-09-2024Is Assigned Passed on 08-09-2024
| Assigned to Inspector: VINCENT MCCRAVE |