1st Rough Plumbing Inspection (#1)Scheduled For: 12-07-2023Is Assigned
Passed on 12-07-2023
| Assigned to Inspector: Steven Chmura |
2nd Rough Plumbing Inspection (#1)Scheduled For: 03-01-2024Is Assigned
Passed on 03-01-2024
| Assigned to Inspector: Steven Chmura |
Dry-In Inspection (#1)Scheduled For: 03-15-2024Is Assigned
Passed on 03-15-2024
| Assigned to Inspector: VINCENT MCCRAVE |
Engineering Erosion Control Inspection (#1)
Waived on 09-07-2023
<p class="MsoNormal">Based on our review, it doesn’t appear that construction
activity would affect the neighboring properties, any wetlands/waterways,
and/or our stormwater drainage system. We have waived this inspection so you
may continue forward on your project. Please be sure to have erosion control
measures in place throughout the construction process to prevent offsite
sediment and stormwater runoff. An inspection may be added later if we receive
a complaint and/or observe offsite impacts. <o:p></o:p></p>
Final Electric Inspection (#1)
Final Irrigation Inspection (#1)
Final Mechanical Inspection (#1)
Final Plumbing Inspection (#1)
Footing Inspection (#1)Scheduled For: 01-19-2024Is Assigned
Closed on 01-19-2024
| Assigned to Inspector: DAVID CRUM |
Frame Inspection (#1)Scheduled For: 05-09-2024Is Assigned
Passed on 05-09-2024
| Assigned to Inspector: DAVID CRUM |
Lintel Inspection (#1)Scheduled For: 02-13-2024Is Assigned
Passed on 02-13-2024
| Assigned to Inspector: DAVID CRUM |
Pre Electric Pre Final Inspection (#1)Scheduled For: 09-19-2024Is Assigned
Failed on 09-19-2024
| Assigned to Inspector: Andrew J Mylrea |
09-19-2024See Violation Details in Comments
Transferred to Re-inspection09-19-2024
electric trim not started.
Panel and all receptacles not safe.
Pre Electric Pre Final Inspection (#2)Scheduled For: 11-18-2024Is Assigned
Passed on 11-18-2024
| Assigned to Inspector: Jeremy Lentz |
09-19-2024See Violation Details in Comments
Complied11-18-2024
electric trim not started.
Panel and all receptacles not safe.
Pre Power Release (#1)Scheduled For: 11-18-2024Is Assigned
Confirmed on 11-18-2024
BLD202302543 Owner Name: CUBIDES MARCO & VARGAS ANA Inspection Passed on: 11/18/2024
Rough Electric Inspection (#1)Scheduled For: 05-03-2024Is Assigned
Failed on 05-03-2024
| Assigned to Inspector: Andrew J Mylrea |
05-03-2024See Violation Details in Comments
Transferred to Re-inspection05-03-2024
Waterproofing missing behind meter can.
FBC
Rough Electric Inspection (#2)Scheduled For: 05-08-2024Is Assigned
Passed on 05-08-2024
| Assigned to Inspector: JOHN S NASUTA |
05-03-2024See Violation Details in Comments
Complied05-08-2024
Waterproofing missing behind meter can.
FBC
Rough Mechanical Inspection (#1)Scheduled For: 05-03-2024Is Assigned
Failed on 05-03-2024
| Assigned to Inspector: Andrew J Mylrea |
05-03-2024See Violation Details in Comments
Transferred to Re-inspection05-03-2024
Install and insulate primary drain for air handler.
Install protective chase over copper lines on exterior wall.
Rough Mechanical Inspection (#2)Scheduled For: 05-08-2024Is Assigned
Passed on 05-08-2024
| Assigned to Inspector: JOHN S NASUTA |
05-03-2024See Violation Details in Comments
Complied05-08-2024
Install and insulate primary drain for air handler.
Install protective chase over copper lines on exterior wall.
Sheathing Inspection (#1)Scheduled For: 02-28-2024Is Assigned
Failed on 02-28-2024
| Assigned to Inspector: DAVID CRUM |
02-28-2024See Violation Details in Comments
Transferred to Re-inspection02-28-2024
sheathing loose in 2 spots marked on inside walls
Sheathing Inspection (#2)Scheduled For: 03-07-2024Is Assigned
Passed on 03-08-2024
| Assigned to Inspector: VINCENT MCCRAVE |
02-28-2024See Violation Details in Comments
Complied03-08-2024
sheathing loose in 2 spots marked on inside walls
Slab Inspection (#1)Scheduled For: 05-03-2024Is Assigned
Passed on 01-19-2024
| Assigned to Inspector: DAVID CRUM |
Bond Beam/Stemwall Inspection (#1)
Structural Frame Inspection (#1)Scheduled For: 02-28-2024Is Assigned
Failed on 02-28-2024
| Assigned to Inspector: DAVID CRUM |
02-28-2024See Violation Details in Comments
Transferred to Re-inspection02-28-2024
plans call for 36" strap on bearing wall in garage. marked on studs fbc107.4 not per plans
Structural Frame Inspection (#2)Scheduled For: 03-07-2024Is Assigned
Passed on 03-08-2024
| Assigned to Inspector: VINCENT MCCRAVE |
02-28-2024See Violation Details in Comments
Complied03-08-2024
plans call for 36" strap on bearing wall in garage. marked on studs fbc107.4 not per plans
T-Pole Inspection (#1)
Wire Lath Inspection (#1)
Final Roof Inspection (#1)