PERMIT SEARCH PORTAL
Details

Identification

Permit Number
BLD202500293
Type
New SFD - New Sfd
Added On
01-07-2025 03:11 PM
Declared Value
$170,000.00


Status (Closed)

Expires On
07-16-2025
Issued On
01-17-2025
Final On
Certified On


Description of Work

New Single Family Home  **NOC OR BK:3530 PG:1547 FOR SFD. RECORDED NOC TO BE POSTED ON SITE.**  **SITE APPROVED FOR SFD W/12'9"X8'6" LANAI ONLY 4 TREES REMAIN*



Site Information

Primary Address
6440 N CANFIELD WAY DUNNELLON, FL 34434
Other Linked
1817100230165700220 CITRUS SPRINGS UNIT 23
17
18
34
16570
0220


Contacts

Contacts

Licensed Contact Primary 4U CUSTOM HOMES CORP 8250 EXCHANGE DRIVE, STE 134 ORLANDO, FL 32809

Licensed Contact MASSFLO PLUMBING INC 3930 Cochise Terrace Sarasota, FL 34233

Licensed Contact ARROW ELECTRICAL SERVICES LLC 1673 Via Lago Drive Lakeland, FL 33810

Licensed Contact THERMODYNAMICS LLC 2910 BRONCO LN, ORANGE COUNTY ORLANDO, FL 32822

Property Owner K & L INVESTMENT LLC 8250 EXCHANE DR SUITE 134 ORLANDO, FL 34434



Related

Building Permits

Child BLD202500293-01 Amendment 07-14-2025 Closed



Progress

Reviews
Permit Specialist Review Approved

Addressing Review Approved

Engineering FFEA Review Approved

Environmental Health Review Approved
| Assigned to Reviewer: Taylor Schwing taylor.schwing@citrusbocc.com |
Plans Examiner Review Approved

Driveway Review Approved
15" Culvert to allow for proper drainage from high to low side of entire property frontage within the ROW.
Site Review Approved
 **SITE APPROVED FOR SFD W/12'9"X8'6" LANAI ONLY 4 TREES REMAIN*
Utility Review Approved
<div>Lot must connect to Citrus County’s Central Water System.</div><div><div>Permitee/Owner must supply and install a pressure regulator.&nbsp;</div></div><div><div>If future central sewer becomes available, lot will be required to connect within 365 days of notification.&nbsp;</div></div><div><div>Water meters will not be installed on a lot that is not cleared and staked.&nbsp; &nbsp;It is the Permitte/Owner's responsibility to notify Citrus County Utilities that the lot is cleared and staked to begin the water meter installation process.&nbsp;</div><div>Once the water meter is installed, it is the Permitee/Owner's responsibility to maintain the integrity of the water meter and parts. Any damage, missing parts and/or removal of the water meter will result in a minimum $250 Tampering Fee which will be added to the active permit. See County Code: Sec. 102-140. - Damaging, tampering with, or altering service unit's facilities.</div><div>1.2.12 FINAL INSPECTION</div><div>The Permitee/Owner must request the Utility final inspection of the project after all construction activities are completed.</div></div><div><br></div>
Additional Information

01-16-2025DigEplan Review 01-16-2025
PERMITEE/OWNER MUST SUPPLY AND INSTALL A PRESSURE REGULATOR

01-16-2025DigEplan Review 01-16-2025
IF FUTURE CENTRAL SEWER BECOMES AVAILABLE, LOT WILL BE REQUIRED TO CONNECT WITHIN 365 DAYS OF NOTIFICATION

01-16-2025DigEplan Review 01-16-2025
LOT MUST CONNECT TO CITRUS COUNTY’S CENTRAL WATER SYSTEM.

Review Consolidation Approved
| Assigned to Reviewer: Taylor Schwing taylor.schwing@citrusbocc.com |
Pre Permit Issuance Review Add Fees
| Assigned to Reviewer: Taylor Schwing taylor.schwing@citrusbocc.com |
Pre Permit Issuance Review Approved
| Assigned to Reviewer: Taylor Schwing taylor.schwing@citrusbocc.com |
NOC Review Approved
| Assigned to Reviewer: Taylor Schwing taylor.schwing@citrusbocc.com |

Conditions

Inspections
1st Rough Plumbing Inspection (#1) Closed

Engineering Erosion Control Inspection (#1) Waived on 01-21-2025
<p class="MsoNormal">We have waived this inspection so you may continue forward on your project. <br> <b>Please be sure to have erosion control measures in place throughout the construction process to prevent offsite sediment and stormwater runoff.</b> <br> Based on our review<a name="_Hlk151035484">, it doesn’t appear that construction activity would affect any Wetlands, Waterways, and/or the County’s Stormwater Drainage System. <br> An inspection may be added later if we receive a complaint and/or observe offsite impacts.</a><o:p></o:p></p> <p class="MsoNormal"><o:p>&nbsp;</o:p></p> <p class="MsoNormal">Erosion control measures are required to be in place as soon as any ground disturbance begins and maintained throughout the construction process. <o:p></o:p></p> <p class="MsoNormal">Erosion control measures such as a vegetative buffer, silt fence, or any appropriate Best Management Practice, as described in the Florida Stormwater Erosion and Sedimentation Control Manual, may be used. The manual can be downloaded at <a href="https://www.fsesci.com/downloads/">https://www.fsesci.com/downloads/</a> <o:p></o:p></p> <p class="MsoNormal">A vegetative buffer is the most efficient and cost-effective form of erosion control. For most sites, a minimum of 15 ft of undisturbed vegetation is a sufficient buffer. Steep sites may require a larger buffer area. A vegetative buffer can be reestablished on a disturbed site with the installation of sod. Silt fence is the most commonly used form of erosion control protection. Silt fence needs to be placed so that it includes all areas of fill or disturbed soils, and the silt fence needs to be keyed into the ground (buried up to the line, you should be able to pull up on the silt fence at any point and it does not move at the ground). Additional BPMs may be needed for sites with steep slopes.<o:p></o:p></p> <p class="MsoNormal"><o:p>&nbsp;</o:p></p>
Slab Inspection (#1) Closed