PERMIT SEARCH PORTAL
Details

Identification

Permit Number
201804172
Type
BPSTORAGE - Storage Type Permits
Added On
04-18-2018 04:24 PM
Declared Value
$2,450.00


Status (Closed)

Expires On
02-26-2019
Issued On
05-15-2018
Final On
08-31-2018
Certified On


Description of Work

26 x 28 DETACHED WORKSHOP WITH ELECTRIC *NOC N/A* *SITE APPROVED FOR 26 x 28 SINGLE STORY DETACHED WORKSHOP *A MINIMUM OF 6 TREES ARE TO BE RETAINED ON SITE*



Site Information

Primary Parcel (ID 1718350020000M00290)
CRYSTAL PARADISE ESTS UNIT 2 PB 4 PG 88 LOT 29 BLK M
CRYSTAL PARADISE ESTATES U-2
18
17
35
000M0
0290

Other Linked
113 N FRANCIS TER CRYSTAL RIVER, FL 34429


Contacts

Contacts

Other APPLICANT

Licensed Contact Primary KEITH M SCOTT CONSTRUCTION INC 5675 SW 178TH TERRACE DUNNELLON, FL 34432

Property Owner DANIEL LOCKLER 11607 W KINGFISHER CT CRYSTAL RIVER, FL 34429

Property Owner BARBARA J KALDAHL 11607 W KINGFISHER CT CRYSTAL RIVER, FL 34429

Other BRENDA MCKENZIE MCKENZIE PERMITTING 7232 E GOSPEL ISLAND RD INVERNESS, FL 34450

Licensed Contact LAKE SUMTER ELECTRIC, LLC 2315 GRIFFIN ROAD, UNIT 7 LEESBURG, FL 34748



Related

Building Permits

Parent 201003250 Swimming Pool Type Permits 05-03-2010 Closed



Progress

Reviews
04-21-2018RESIDENTIAL BUILDING REVIEW Approved

04-21-2018FINAL PROCESSING REVIEW Approved

04-21-2018RESIDENTIAL SITE PLAN REVIEW Approved
SITE APPROVED FOR 26 X 28 SINGLE STORY DETACHED WORKSHOP *A MINIMUM OF 6 TREES ARE TO BE RETAINED ON SITE*
04-21-2018FLOOD REVIEW Waived


Conditions

PROOF OF OWNERSHIP NEEDED H8 CONV FIX on 04-21-2018


Inspections
SLAB (#1)Scheduled For: 06-20-2018Is Assigned Passed on 06-20-2018

LINTEL (#1)Scheduled For: 07-25-2018Is Assigned Passed on 07-25-2018
06198
SHEATHING (#1)Scheduled For: 08-15-2018Is Assigned Passed on 08-15-2018
06198
ROUGH ELECTRICAL (#1)Scheduled For: 08-15-2018Is Assigned Passed on 08-15-2018
underground only
Violations

08-15-2018OTHER
Underground only

STRUCTURAL FRAME (#1)Scheduled For: 08-15-2018Is Assigned Passed on 08-15-2018
06198
FRAME (#1)Scheduled For: 08-15-2018Is Assigned Passed on 08-15-2018

ROOFING (#1) Passed on 08-27-2018

FINAL BUILD (#1)Scheduled For: 08-30-2018Is Assigned Passed on 08-30-2018
06198
FINAL ELECTRIC (#1)Scheduled For: 08-30-2018Is Assigned Passed on 08-30-2018
06198
DRY-IN INSPECTION (#1) Passed on 08-27-2018