FOOTER (#1)Scheduled For: 06-04-2010Is Assigned
Passed on 06-04-2010
BOND BEAM/STEMWALL (#1)Scheduled For: 06-09-2010
Passed on 06-09-2010
1ST ROUGH PLUMB (#1)Scheduled For: 06-11-2010
Closed on 06-11-2010
****IS THIS NOT REQUIRED BEFORE THE SLAB PLEASE ADVISE IF NOT NEEDED****KIME
06-11-2010OTHER-GENERAL ALL TYPES
1. rough plumbng not req-appears to be a portable hot tub being recessed in earth
SLAB (#1)Scheduled For: 06-11-2010
Passed on 06-11-2010
LINTEL (#1)Scheduled For: 06-17-2010
Passed on 06-17-2010
SHEATHING (#1)Scheduled For: 06-24-2010
Passed on 06-24-2010
ROUGH ELECTRICAL (#1)Scheduled For: 06-29-2010
Passed on 06-29-2010
STRUCTURAL FRAME (#1)Scheduled For: 06-29-2010
Passed on 06-29-2010
FRAME (#1)Scheduled For: 09-20-2010Is Assigned
Passed on 09-20-2010
ROOFING (#1)Scheduled For: 09-20-2010Is Assigned
Passed on 09-20-2010
FINAL BUILD (#1)Scheduled For: 09-20-2010Is Assigned
Passed on 09-20-2010
FINAL PLUMBING (#1)Scheduled For: 09-20-2010Is Assigned
Passed on 09-20-2010
FINAL ELECTRIC (#1)Scheduled For: 09-20-2010Is Assigned
Passed on 09-20-2010
FINAL MECH (#1)Scheduled For: 09-20-2010Is Assigned
Passed on 09-20-2010
DRY-IN INSPECTION (#1)Scheduled For: 09-20-2010Is Assigned
Passed on 09-20-2010
roof was done without partial meet with roofer to see what can be done ETB
WIRE LATHE (#1)Scheduled For: 06-29-2010
Passed on 06-29-2010